PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date
END Date

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.



2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), CITY OF DREAMS - Hotels & Casino Resort

START Date
END Date

PLANNING MANAGER for:

"City of Dreams - Hotels and Casino Resort" - Macau (approx. USD 3B)

CASINO RESORT featuring 2000 hotel rooms and an underwater themed gambling casino.

A joint venture project (Leighton-China State-John Holland JV) for the design & build of:

4 nos. of luxury HOTELS

  • 34 flrs - Crown Hotel
  • 30 flrs - Hardrock Hotel
  • 32 flr-Hyatt Regency
  • 35 flrs-Grand Hyatt

Casino & Retails:

  • 34,500 sq.m. Retails and Casino Gaming Area



 

Planning Manager, Bovis International, Development of Downtown Jebel Ali - Dubai

START Date
END Date

In Charge of all strategic Planning for the 10 Billion Dhs Development of Downtown Jebel Ali by Limitless [a sister company of Nakheel], it comprises the building of a 200 multi-storey mixed use Towers, 7 District Cooling Plant, 7 Substations (132 kv), 4 Metro Stations and 7 Plazas over the next 5 years, as well as the coordination between Towers Constructions and the Infrastructure work from Design Procurement phases to handover stage.