Hindustan Construction Company Ltd.(HCC) Planner

1. Preparation of milestones

2. Scheduling of work programme / L3 network in Primavera

3. Preparation of Manpower Mobilization Schedule, Procurement Schedule, equipment mobilization Schedule

4. Advise and assist the contractor in the development of the short term work plan.

5. Review/approve contractor’s work programs submissions.

6. Participate in contract administration meetings.

7. Record and report the actual progress of the work versus the planned work.

8. Deviation Analysis

9. Preparation Of Project Budget & Cash Flow

Limak construction CO Senior Planner

Project:

Emergency rehabilitation of Kabul - Salang - Doshi Road project, (Section 2, Olang - Doshi section), including bridges and tunnels, Total 75 km, 2 lane highway re-design, and construction activities. Total $29.6 M. USAID funded, supervised by Louis Berger Group of USA as a consultant.



Responsibilities: (Reporting to Project Manager)

•     Preparing daily, monthly progress reports,

•     Preparing progress certificates and submitting to consultant,

•     Coordinating the procurement activities,

Hindustan Construction Co Ltd Assistant Planner

•     Preparation of Daily, Weekly & Monthly Progress Reports through System Application & Product in Data Processing (SAP).

•     Preparation of budget for the project and monthly invoicing of the same.

•     Planning for infrastructure works (like Crushing Plant 150 TPH,Batching plant 30m3/hrs & 60m3/hrs, Labour & officers prefabricated camps.

Kumagai , Skanska ,HCC Itochu JV Civil Engineer

•     Monitoring & Planning 100 MT Cutting & Bending in Single Shift.

•     Supervision of all activities from receipt to dispatch of Reinforcement.

•     Co-ordination with Quality Control & Client for Quality Assurance & Testing of Materials.

•     Stock Monitoring based on requirement of four sections of MC1A.

•     Production Planning based upon manpower & demand from site during peak time.

MAKIMSAN Civil Engineer

Project:

     Rehabilitation (re-design and construction) of existing 2 lane highway between Ankara –

     Samsun, approximately. 100 Km. The client: General Directory of State Highways.

     

     Responsibilities: (Reporting to Site Manager)

     Redesigning the highway by changing the alignments and rebuilding the sub grades and layers by using software Net CAD and NetPRO,

Obayashi Corporation Lead Planner

DUBAI METRO RAIL PROJECT

Detailing of Baseline Schedules as per Client Reqmt

Cost Loading of Program as per Contract BOQ

Daily, Weekly, Monthly Progress Reporting to Client and Higher Management

Monthly Progress Presentations to Client

Assessment of Subcontractors Baseline Schedule

Preparation of Client Invoices using Primavera Cost Loaded Programs

Tracking of Design Consultants Program

Program related assistance to Delay Claim Assessment/Analysis