MAKIMSAN Civil Engineer

Project:

     Rehabilitation (re-design and construction) of existing 2 lane highway between Ankara –

     Samsun, approximately. 100 Km. The client: General Directory of State Highways.

     

     Responsibilities: (Reporting to Site Manager)

     Redesigning the highway by changing the alignments and rebuilding the sub grades and layers by using software Net CAD and NetPRO,

     Redesigning and construction of sewage and surface water collection systems,

     Preparing show drawings,

     Scheduling, follow-up

     Cost controlling,

     Preparing Interim payment certificates,

     Assisting Site manager,

     Supervising the site activities,

     Topographic mapping,

     Procurement activities,

     Controlling the asphalt mix-design,

     Controlling concrete mix design,

     Asphalt plant operation management,

     Calculation of the quantities by using several techniques.