Project:
Rehabilitation (re-design and construction) of existing 2 lane highway between Ankara –
Samsun, approximately. 100 Km. The client: General Directory of State Highways.
Responsibilities: (Reporting to Site Manager)
Redesigning the highway by changing the alignments and rebuilding the sub grades and layers by using software Net CAD and NetPRO,
Redesigning and construction of sewage and surface water collection systems,
Preparing show drawings,
Scheduling, follow-up
Cost controlling,
Preparing Interim payment certificates,
Assisting Site manager,
Supervising the site activities,
Topographic mapping,
Procurement activities,
Controlling the asphalt mix-design,
Controlling concrete mix design,
Asphalt plant operation management,
Calculation of the quantities by using several techniques.
Rehabilitation (re-design and construction) of existing 2 lane highway between Ankara –
Samsun, approximately. 100 Km. The client: General Directory of State Highways.
Responsibilities: (Reporting to Site Manager)
Redesigning the highway by changing the alignments and rebuilding the sub grades and layers by using software Net CAD and NetPRO,
Redesigning and construction of sewage and surface water collection systems,
Preparing show drawings,
Scheduling, follow-up
Cost controlling,
Preparing Interim payment certificates,
Assisting Site manager,
Supervising the site activities,
Topographic mapping,
Procurement activities,
Controlling the asphalt mix-design,
Controlling concrete mix design,
Asphalt plant operation management,
Calculation of the quantities by using several techniques.