Roads / Tunnel / Bridge

Titan Group of Companies Project Manager

•     Prepared the over all construction schedule and see the required manpower, equipment, materials and supplies are anticipated and provide such that the approved construction schedule is maintained.

•     Coordinated all field activities with the various sub-contractors engineers, foreman and assign the day-to-day task and assured that the final construction meets the overall schedule, layout, and installation requirement of the contract.

Telcom Records Management, Inc. Project Controls Engineer

•     Responsible for the supervision of the banks construction project to ensure that the design and specification are complied with the acceptable methods of construction.

•     Responsible for the coordination of activities of the bank to ensure the efficient execution of construction activities.

•     Responsible for the preparation of percentage accomplishments, completion of the contractor for payment purposes.

•     Responsible for obtaining any required permits for the progression of work.

Nael & Bin Harmal Hydroexport-W.L.L. Planner

•     Liaise with all concerned engineers, managers, subcontractors in order to formulate a master plan of a project

•     Establish and develop master schedules including procurement schedules.

•     Liaise with the project manager and other concerned to establish project needs for resources.

•     Analysis to project cash flow, actual vs. plan, and forecasts.

•     Prepared daily construction activities and maintained records

•     Prepared Inspection report and maintained records.

Quantity Surveyor/Estimator, Hafeera Group, 1) Infrastructure 2) Sewerage Treatment Plant 3) Bridge works 4)Building works

START Date
END Date

Areas of Expertise

 

Project Estimation & Analysis                             Cost Planning & Management         

BLA Engineering Ltd Trainee Planner

1. Scheduling of L3 network in MS Project

2. Preparation of Manpower Mobilization Schedule, Procurement Schedule, Equipment mobilization Schedule

3. Review the sub contractor’s work programs submissions.

4. Participate in contract administration meetings.

5. Record and report the actual progress of the work versus the planned work.

6. Assist the Planning Manager in reporting the Deviation Analysis

7. Assist the Planning Manager in Preparation Of Project Budget & Cash Flow

8. Monitor the Project Budget & Cash Flow