Planning, Scheduling & Programming Discussion

Description

General planning comments and questions.

Container
No

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Planning Practical Tool - VBA spreadsheet program for Resource Profile Curve

V
victor ruiz 👤 Member for 9 years 3 months

The Resource Profile Curve or more commonly known as S-Curve effectively presents the project workload distribution in terms of labor units or cost of a baseline schedule. During program updates, the S-curve reflects the project performance by means of the actual curve and actual periodic bars.

Most often, the Progress Profile Curve is a basic requirement to be included in baseline schedule proposal and progress reports.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Weather delay - calendar vs delay activity

A
Ahmet Tuter 👤 Member for 13 years 4 months

I understand that the correct practice is to make a calendar for weather affected activities and use that calendar for accounting weather delays in schedule

But what if, instead of a delay calendar, we include a delay activity in the end and do not assign any resources to that, isnt it still the same? what is the disadvantage of that?

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Bridging The Gap - Planning Practical Solutions

V
victor ruiz 👤 Member for 9 years 3 months

I called it Planning Practical Solutions.

I invented this name or maybe some other person already used it before, that I am not aware of.

I am creating spreadsheet VBA programs as tools that will help us planners to efficiently cope up with our workload. If workload is not too much, it is still enjoyable to have these tools automate your routines.

P6 is a very powerful scheduling software, calculation of dates and floats based on your sequencing of work is its main strength. It is highly accurate as well, considering that the unit of measurement is by time.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

500/220 kv gas insulated substation (GIS) planning , scheduling , and cost estimation

hello 



i make my graduation project on construction of a 500/220 kv gas insulated substation , i have the plan of civil works but i don't know anything about the electrical part. so can you please help me by sending me a plan or WBS of any high voltage substation ? 

thank you 

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts