9days delayed

A
Ahmed Sho 👤 Member for 8 years 1 month

Hello guys
It's the last day of the month and I have been assigned couple of projects to update, I have updated most of it but I have 2 projects left to update. One of this projects already have 9 days delay with a terminal float duration of 6 days. Please can anyone help me of how to update this delayed projects...Thanks

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

132 kv substation turnkey project schedule

I am involving in a planning of turnkey Substatiin construction in India.It is completely new field to me.Can any ine suggest with the sequence of activities which is normally used.If possible any sample schedule of it to get overall idea.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Etan Walls, COO at Allied Physicians Group, shares insights regarding challenges & top trends in Healthcare IT industry.

A
Alex Carter 👤 Member for 8 years 3 months

Etan started in 2011 as EMR Analyst and now serves Chief Operating Officer for Allied Physicians Group, a premier primary care independent physician group with over 30 locations throughout the New York metropolitan area, as well as, Board Member of the Allied Foundation. In his professional role, Etan is responsible for the internal coordination and implementation of the Allied strategic organizational vision by guiding and leading the internal teams.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Change Order Impact Study

Hello,

In my project I've "revised baseline" Dated 31-05-2017 and "recovery schedule" Dated 20-01-2018, updates are applied on the recovery schedule. Now, I've few change orders that I need to study thier impact and decide the EOT the Contractor deserves.

which one should I use and why, the revised baseline or the recovery schedule?

Clarification: the "recovery schedule" has the same end date and budget of the "revised baseline".

 

Thanks

A. AbdRabou.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Resource Profile Curves for Oil & Gas FEED Projects

Greetings,

I have been working on and wanted to know from your experience that which resource profile curves (either P6 default or customized such as deliverable or discipline specific) works best for Oil & Gas FEED projects, so that the overall Engineering Actual profile appears similar to the planned one resulting in reflection of correct performance indicators?

Thanks in advance for your support.   

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

How to schedule multiple project together that have different resource Max unit/time

B
Ben Chow 👤 Member for 13 years 8 months

Hi fellow planners,

I am using Primavera 6 and I have multiple projects running at different location in the sea (off shore oil and gas platform) for a project to be executed offshore we need a barge or workboat as a resource there.

I can do the planning for a single site work execution easily and also do resource levelling depending on the project but now I need to schedule the project for multiple locations together because I need to plan the barge/workboat movement.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Resources Labour units not recalculating after Loading

Hi! I assigned some resource for trial, with its "Default Units/ time as 8/d" and then I assigned it to activities. After scheduling, the programme calculates the labour units based on that. 

(Pic 1) But then when I change the same resource "Default Units/time as 2/d" and scheduled, it does not recalculate the Labour units.

(Pic 2) I tried doing it with cost, changing it from $2/d to $8/d. And then I Clicked on "Recalculated the cost assignment" and it worked. In pic 2 you can see the Cost changed but labour units did not, even after scheduling.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts