DACE labor productivity norms

Hi everybody,

I am leading the planning office of my company mainly involved as EPC contractor in industrial plants and infrastructures.

After many years, I have the opportunity to purchase a database of labor productivity norms. I am trying to find a usable database (USGC or DACE for instance) or like a big excel table I mean in the market. But to now I have not found anything.

The purpose is to use a recognised system to estimate the size of a project from BoQs, and to have a shared system with other offices (proposal, engineering dpt, ...)

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

A survey on Impact of construction programme and cash flow tecniques

Dear Participant,

I invite you to participate in a research study entitled-IMPACT OF CONSTRUCTION PROGRAMME & CASH FLOW ON CONTRACTOR’S PROFITABILITY

 I am currently enrolled in the MBA (Construction and Real Estate) at the University College of Estate Management, Reading UK and am in the process of writing my master’s thesis. The purpose of the research is to determine to what extent the programmes of works and cash flow system affects a building contractor’s profitability

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Error in P6 R8.2- Application Event

S
san TS 👤 Member for 14 years 5 months

Hello,

Iam doing a Time impact analysis and in the Projects layout , i was copying and pasting the baseline to create more windows for analysis. After doing this and completing few windows, there was an error as shown below,

"An application event has been intercepted. Please note the event code for reference.

Event Code  PPUSP-0516-B".

I understand that this is due to size constraints. Then i tried to delete some projects, but then again there is another error(another application event code  UPDAT-1921-B).

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

P6 Reports - Data fields empty

When I run some reports for time distributed units, the data fields are empty. However, if I step through the reports wizard and run the report from there the data appears. Currently using R15.2 but encountered the same problem in a previous version.

The resource assignments page displays all of the data correctly so it is only in Reports that I have the problem.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Performance % Complete Change After Assigning Baseline

As per the above subject, there's a difference in Performance % complete before and after I add & assigne a baseline.

that difference is not for all items, some items doesn't change.

I need to understand what happened.

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

Bachelor thesis in sustainable development in project planning and implementation

Hi all!

It would be greatly appreciated if you could take the time to answer our survey on sustainablility in project management. Thank you!

https://bino.qualtrics.com/jfe/form/SV_eeWB8yV7rRyTGoB

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts

EPC Engineering Planning

D
Deplan Z 👤 Member for 8 years 1 month

Hi,

Need Some Expertise on Engineering Planning for a Small Refinery Project Let say 1000 Equipments:

1. How many total Engineering manhours Should be Estimated based on Number of Equipments ?

2. How long the Engineering Will go to give Sufficient Fronts for Procurement & Construction ?

 

Regards,

Deplan

Forum Sponsor

Top Posters

Josephus Enot
1 posts
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts