Planning, Scheduling & Programming Discussion

Description

General planning comments and questions.

Container
No

25% PFS and 10% BFS Schedule templates

I was wondering if there is anybody out there that has got standard templates for a 25% Pre-Feasibility Study and a 10% Bankable Feasibility Study? We are setting up a new project in South Africa and I need to train a junior Planner but do not have all the time in the world to do that and be doing my projects schedules. I am busy developing a Execution schedule but he need to set up the above schedules for studies.

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

OIL & GAS PLANT TURNAROUND & SHUTDOWN MAINTENANCE

M
Mufiz Sayed 👤 Member for 17 years 9 months

This Forum is created to discuss the Best practices & issues / concerns for T/A & S/D

  • Definition of Turnaround and its phases
  • Issues & concerns during T/A planning, implementation & execution phase
  • Business requirement for handling the T/A
  • Technical features & Evaluation of T/A & S/D Project Management Softwares utilizing latest & proven technology
  • Economics & conclusions

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Filter for activities on same path

M
Matthew Lin 👤 Member for 16 years 2 months

Hello Planners,

 

Just a quick think when Im doing a new schedule analysis,

Once an activity has logic links then it should on one/several specify path.

Is there any possibility to have a filter to filtrate all relative activities on the path? ... not only the critical one.

So we don't need to check those activities with "Go to" / "Jump"

 

Can it work to set an "activity has same total float" for that purpose? Or even there is software has that function?

 

Rgds,

Matthew

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

CPM Networks in mass housing projects

P
prabu deva 👤 Member for 19 years 5 months

Dear All,

I am preparing  a CPM network for 25 low rise buildings GF+4 floors ,request your thoughts to do a proper network.Does relationships  indicating movement of trades for all trade activies from one  building to another to be included in order to have a proper network.If we link only the activities within a floor and within floors of  a building and indicate the movement of trades between the buildings for only major activities will it provide a proper network.

Thanks in advance

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Precommissioning / Commissioning Activities & Sequence

A
Angel Cruz 👤 Member for 16 years 1 month

Hi,

Actually I'm preparing draft schedule for Precommissioning & Commissioning schedule for LNG Terminal Project.

And I come out with these activities as follows:

 

Precommissioning:

  1. Hydrotest of Pipelines

  2. Leakage Test of Pipelines

  3. Flushing & Cleaning of Pipelines

  4. System dry-out

  5. Inerting

  6. Systematic Conformity Check of Equipment

  7. Static, De-energized Test of Equipment

Commissioning:

  1. Preliminary Check

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts