Bringing whole schedule in by a month
I have a schedule which the PM has asked for me to bring in by an entire month.
He wishes to know which items (which perhaps aren't critical now) would become critical if the whole delivery was brought in by a month.
I realise there a number of ways to do this (finish on/mandatory constraint, Filters etc.) but I was wondering what others or experienced PPs would do.
Thanks
- Read more about Bringing whole schedule in by a month
- 1 comment
- Log in or register to post comments
Forum Sponsor
Top Posters
3D Gantt
Or how to read the project interfaces.
- Read more about 3D Gantt
- Log in or register to post comments
Forum Sponsor
Top Posters
UPDATING THE PROJECT
Dear All,
My situation is now the project manager want me to change the planned start and finish dates for not started activities.
My question is, In updating the schedule, can I change also the planned start and planned finish dates?
Regards
- Read more about UPDATING THE PROJECT
- 6 comments
- Log in or register to post comments
Forum Sponsor
Top Posters
Primavera Project Duration
Hi,
Would like to ask some help with regards to the image below. Have asked a subcontractor to provide an EOT and to use the latest update of the schedule without the baseline. I've noticed that in Primavera 8, the duration of the civil works doesn't seem to tally. Looking at the program that it still uses the original plan dates, allthough there are no baseline. This is only showing to activity with actual dates, is this an anomaly of Pv8 if it's then what are the remedial of this?
Need advice and ragards.

- Read more about Primavera Project Duration
- Log in or register to post comments
Forum Sponsor
Top Posters
Need Oil & Gas Basic program
Dear Friends,
As i had worked in different fields of Civil engineering like building ,Roads ,infrastructure and gained little experience and i want to have idea about the program in the field of oil and gas Industry as i dont know about anything of this induistry if somebody has old program or basic program Please send to [email protected] .
Thanks
- Read more about Need Oil & Gas Basic program
- Log in or register to post comments
Forum Sponsor
Top Posters
Slippages in the schedule
What does it mean when you have continous slippages in your schedule on every update? How do you solve this issue?
- Read more about Slippages in the schedule
- 7 comments
- Log in or register to post comments
Forum Sponsor
Top Posters
Critical Chain Project Management
Does anybody uses Critical Chain Project Management .... which software supports this method of scheduling and tracking.
- Read more about Critical Chain Project Management
- 5 comments
- Log in or register to post comments
Forum Sponsor
Top Posters
When importing programme to P6 from MS project ,how to assign the baseline
Hi All,
I was importing programme from MS project to P6.It's quite difficult to assign a baseline on the progress programme,because everymonth there will be new activities added to MS project.So when import this to P6 and assigning the baseline to this takes a lot of time.
Is there a quick way to fix this.
Comments and help appreciated from everybody.
Thanks,
Rinet
Forum Sponsor
Top Posters
Planning Schedule Considerations
Hi Everybody,
I am Ashik working as a Project Planner. I wanted to know before starting of the schedule which things i need to consider
For Example :
1. Which Relationship is preferrable for Links (SS or FS or FF) for monitoring?
2. Lead or Lag is preferrable? (FS-10days or SS+5days)?
3. How much float will be the maximum?
4. How much contribution of relationships in the total duration? (SS activities should not more than 10% of Total Duration)?
- Read more about Planning Schedule Considerations
- 11 comments