Different types of programs during project life cycle.

R
Rami Refaat 👤 Member for 14 years 10 months

Dear All

I create this topic for the sake of understanding different types of programs during project life cycle, i will mention the types i already know but if someone here can explain all of them one by one and when we can use each of them it would be great for all of us.

What i know is: Baseline, Revised Program, Accelerated Program, Recovery Program & Execution Program.

Note: If this topic is already exist in the forum please refer to the topic in a reply.

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Delay Analysis - Windows Analysis Method vs. Time Impact Analysis (TIA) or Time Impact Evaluation (TIE)

Hi Guys/Gals,

I have a confusion about the difference between Window Analysis Method and Time Impact Analysis and also about Time Impact Anaysis and Time Impact Evaluation when use in Delay Analysis.

Please maybe some body out there can explain this jargons.

Thanks.

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Jet grouting

S
Sunil Babu 👤 Member for 15 years 7 months

Dear All,

My question is based on soil stabilization related, in the shaft construction project

under which particular case we will prefer single fluid, double fluid, tripple fluid

jet gouting ? In my project our objective is to control or cut off the ground water seepage

(Before constucting base slab, inside the shaft we have to improve base condition by stopping seepage)

and to minimise the permiability of soil inorder to avoid future complications.

With Regards,

Sunil.

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Struggling to get to grips with BIM?

A
Adrian Vann 👤 Member for 15 years 4 months

Are you comfortable working with BIM tools, or does it seem a bit daunting? Interested to know how many are actively engaged in BIM and who still see it as a challenge. For those who do see it as a challenge, what are the biggest concerns?

Asta and BIM Academy are running a 2 day workshop currently and attendees are saying how some hands on training helps make it clearer. If anyone else is looking for training the course is to be repeated in October

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Float Burn Index

In response to a question in a Discussion group on LinkedIn, I posted some stuff about the Float Burn Index (FBI) that it dawned on me some people here might also find interesting. It's a little like the required run rate in a cricket chase -- a measure of how fast you have to go. Here it applies to non-critical paths.

There are several potential flavors: straight, and with a buffer, are two. I'll explain with a simple example of a straight FBI.

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Scheduling Funded and Unfunded Work on a Large Infrastructure Project

All,

I am attempting to schedule a number of work streams to achieve a milestone on a large infrastructure project. Half of the work streams are fully funded and some have no funding at all but I have predicted procurement, engineering and construction timescales for them. Some people in the project want to only show the funded work in the live forecast schedules and have the unfunded works in a what if schedule whereas others want to show everything in the live forecast schedules.

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

daily target

Dear All

Due to project delay the client have prepare their own schedule as per the remaining work divided to duration of 14 weeks. therefore client come out the daily target however I have concern on the other activity if the activity 1 example cannot meet the daily target then other activity will also affected

is this the write method for planning. any advise

Regards
Ronron

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts

Incorporating A new Time Schedule to your old one

I have this problem at work: I have my time schedule which is updated up to data date, now a new area is going to be added to project scope which the engineering and construction activities have been started 2 months before. now thay ask me to prepare a time schedule for this new work and incorporate it to my plan. please guide me in this regard how can I attach this new schedule to the project schedule(considering that some activitie in both are done or progressed) next how shoud I incorporate this change to the baseline?

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts