PSA : : Primavera P6 Professional 18.8 - XML Import Bug

OK, so we had this problem importing XML files into P6 and it stumped us for a while. It turns out it was a bug in P6 Professional version 18.8 and there is a patch to fix it http://ed.gr/blcwh

I hope this helps other folks that have been struggling with this.

Colin

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Right-click export to Excel -> other layout doesn't give any activities

M
Mi Mo 👤 Member for 7 years 3 months

Hi everybody,

I have been searching for this everywhere, but no succes..

So I always had succes when I used the right-click -> export to excel option.

Now, I have saved some different layouts and when I use a different layout I get an Excel export without any activities.

It does show the title columns.

I tried different view-filters and by accident I had one activity already marked as 'in progress', now this one was shown in the dump.

 

Anyone any idea what the problem is?

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Oracle Database Configration between server

Hi dear friends,

 

I'd like to as you about multi user for installation oracle primavera p6 on server. We will use as two user to conect and manage schedule which will be installed on the server. In this case should we buy one or two licence to use?

 

Any help will be appriciated.

Amir.

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Report fetch from Primavera 15.2 professional

Hello Folks 

1. What are all types of report we can fetch from P6 professional 15.2. (No BI integration )

2. Is there any predefined html code to automate the importing the project data in Primavera. ( We are having html code for exporting data from p6)

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Help- Copying P6 activities to MSP

I need help in copying the activities and their durations (including WBS names) from primavera p6 to MSP

I have tried exporting the P6 schedule into excel and then loaded it into MSP, but unfortunately none of the activities were grouped under the respective WBS (so I spent the day creating summary tasks in MSP and copy pasting the activties in each WBS). The problem is that the P6 schedule has over 3000 activities.

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Configuring the database

A couple of weeks ago I couldn't open my 8.2 stand alone P6 on the laptop loaned to me by the consultancy that I am contracting through. Didn't get any help and got the problem fixed by taking the laptop to a local repairer who deleted quite a few viruses.

P6 now opens but is asking to configure the database. Before I do this I want to verify whether the data in P6 is safe if I configure the database or will configuring overwrite the data?

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Primavera 15.1 - Udf query

Hello Folks ,

Just need to ask about UDF removal / hide

- We are having lots of UDFs which are not using from long time but  consuming lots of data. Is there any way we can filter out which udf is not in use so that we can remove the UDF. Also need to take backup for udf .

Pulkit Verma

+91-7095956111

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Primavera 15.1 - Udf query

Hello Folks ,

Just need to ask about UDF removal / hide

- We are having lots of UDFs which are not using from long time but  consuming lots of data. Is there any way we can filter out which udf is not in use so that we can remove the UDF. Also need to take backup for udf .

Pulkit Verma

+91-7095956111

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts

Using Or Conditions between Slicers to filter Primavera Schedule using DAX

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts