Oracle Primavera - PM6

Description

Here's a place to discuss some Primavera Enterprise questions

Container
No

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Shared mode

Hi

Got a stange one. I'm running standalone as follows:

About: Primavera P6 Professional 24

Release: 24.12.0.51267

Platform: x64

Database Schema Version: PPMDB,2412.0000.0000.0006

PPMDBSQLite.db

Every time I schedule the shared mode warning comes up. No one else uses the database (its standalone). I don't appear to have the 'access' option which lets me choose shared or exclusive use.

I logged out and even tried re-booting.

Anyone know how I can stop this message - its not fatal but very irritating.

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Calendar is causing budget to change

Hello;

I am starting to add budgeted labor units to my schedule.  The activities have a duration type of "Fixed Duration and Units/Time.

I set up my resource id's and assigned them to the activities.  When I go to add the budgeted labor units of say 100 , the budgetd labor units column says 80.  When I look at the detail I see the electrician has 100 budgeted labor units.  

User Preferences are: 

Resource Anaysis Tab

Opened Projects Only

Remaining Early dates

Custom Role Limit

Calculations Tab:

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Performance over VPN (P6 v23.12)

Hi all,

We've recently upgraded our P6 install to v23.12, and have one lingering snag that myself and our IT dept can't solve. I'm hoping someone else here may have had similar and managed to resolve!

 

While in office, performance is spot on - we can schedule projects fine, and importing of XERs is pretty quick.

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

loops sshowing where there are no link

Afternoon all,

 

i'm scheduling a plan and p6 says there is  loop but i haven't started putting links in yet so there can't be a loop yet, 

 

Any ideas on solving the issue? i've been through all activities the screen says are in the looop but none of them have relationships in place. 

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Issue with Schedule % Complete of WBS Showing as 0

L
LEIA B. 👤 Member for 1 year 9 months

My goal is to compare the Planned % and Actual % side by side in the Primavera P6 schedule and ensure that users can see both the Planned % and Actual %. I'm able to display the Actual % using the Duration % Complete without any issues. However, I want to use Schedule % Complete to show the Actual %.

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Prioritization when leveling with P6

Hello guys,

I am currently leveling resources in a oil refinery turnaround project.

I have about 40 heat exchangers that need to be disassembled, cleaned, inspected and reassembled.

The customer wants to reassemble every heat exchanger as soon as the inspection is completed.

However, P6 sometimes pushes the reassembly later than other exchangers activities having a lower priority level.

Did anybody experienced similar situation or any suggestion to resolve this issue?

Thanks in advance

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts

Resource Allocation issue

Hi, I am using V23.12.

I have a fairly small schedule which is fully resource loaded. All dates etc. are correct folowing update.

However, on one activiy in particular, the resource loading has been spread way beond the activity completion date.

Activity completion date is 23 Sept and the resource loading goes on into November. Curve is linear and late dates are only 2 days beyond finish dates.

Anybody any ideas how to correct this?

Thanks

Forum Sponsor

Top Posters

sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts