Missing Level of Effort bar in P6 Professional Gantt Chart Solved

Forum Topic

For the longest time, Primavera P6 Professional has been shipping with a defect in one of the sample layouts. The configuration of the Remaining Level of Effort bar in the Classic Schedule Layout is incorrect. The result of this is the bar failing to...

Jul 31, 2015

P6 xml including all fields

Forum Topic

Hello, I have created an application that takes P6 schedules as an input using an xml parser, only to realise that the xml export from P6 does not contain all of the fields that are available in the xer export. Is there a way to export all fields in ...

Aug 1, 2015

MS Project 2013 - not showing Late Tasks when tasks are updated

Forum Topic

Hi,I have a production schedule for a project on a customers site. Our engineers work to my schedule and report back progress on a daily basis. The schedule has a baseline set and I update this schedule daily and produce a report which should highlig...

Aug 2, 2015

DNA?

Forum Topic

Did you know that the alternative use of the letters DNA is the National Dyslexic Association?

Aug 2, 2015

Delay Analysis Method

Forum Topic

Dear All,I am preparing a EOT claim schedule(only time analysis, no prolongation cost). I am using the method Impacted As planned in order to identify the entitlement. The phases of work is as follows;1. Submission of concept design: 30 days2. Approv...

Aug 4, 2015

EOT Entitelment

Forum Topic

My appology if this one has been discussed before.I am in the middle of discussion with my clkient about our entitelment for an extension of time. Our client asked us to send our price for extera work that was needed for an equipment installation wor...

Aug 6, 2015

Exporting External Activity Relationships to Excel

Forum Topic

Hi All,I need to export all the External Relationships (Predecessors and Successors) in my schedule to Excel so that I can re-import them with some changes.When I run the export, with all projects open, I only get the internal relationships.I can get...

Aug 6, 2015

Hiding unwanted nodes in Project Portfolio

Forum Topic

Hi All,I have set up a Project Portfolio containing three projects. The problem is all the other nodes are still showing, making it difficult to find my projects.How can I set it up so that only my three projects are displayed? Thanks very much Dave

Aug 6, 2015

14 day rolling calendar

Forum Topic

HiDoes anyone know how to set a 14 day rolling calendar in P6.Im trying to make it 11 days working 3 days non working.

Aug 6, 2015

Why Schedule Risk Analysis is a Good Idea

Forum Topic

The trouble with the CPM technique is that it does not take into account uncertainty and because of this it tends to be inherently optimistic in the forecast it provides for project completion...Read More http://ow.ly/QC61N

Aug 7, 2015

Case Study for Primavera P6 Training

Forum Topic

Hello all,I've been working in Oil and Gas project management and really interested in project planning. I'm teaching myself Primavera P6 and currently looking for some case studies for Primavera beginners. If any of you have a few case studies that ...

Aug 7, 2015

Case Study for Primavera P6 Training

Forum Topic

Hello all,I've been working in Oil and Gas project management and really interested in project planning. I'm teaching myself Primavera P6 and currently looking for some case studies for Primavera beginners. If any of you have a few case studies that ...

Aug 7, 2015

Fixed Assignments on Shifts

Forum Topic

How can you display Fixed Assignments on Shifts at the Gantt Table?In the sample schedule above work on Activity 1 is to be performed in two shifts and the required hours per shift are fixed.  I want to display on the Gantt Table information that tel...

Aug 7, 2015

What’s the message??

Blog

A couple of conversations in the last week or so has highlighted the importance of effective communication if you want anyone to take notice of the project information you have carefully gathered and analysed.  Good data, good analysis and good infor...

Aug 9, 2015

Scheduled % not equal to planned % from cost report

Forum Topic

When i checked the planned % by running the cost report i created the planned % is 2.91 but the scheduled % complete is only 2.26%.How can i rectify this?I verfied the planned % of 2.91 by checking the resource usage spreadsheet.

Aug 9, 2015