Staffing plan in P6
Forum TopicDear Planners, I need to create a staffing plan by discipline. The staffing plan needs to be based on heads (name+lastname), for instance: (manhours) Civil wk1 wk2 wk3 Eng.1 40 2...
Dear Planners, I need to create a staffing plan by discipline. The staffing plan needs to be based on heads (name+lastname), for instance: (manhours) Civil wk1 wk2 wk3 Eng.1 40 2...
Hello all, Iam new to this forum and need a little help here as I'm a basic Primavera user.I have created the WBS & the Activities successfully and I finished the predecessors, so the last remain step is to finalize the resources. I added the require...
Hi Everyone, Problem: Few activities earned value is stll zero against duration percentage updated morethan 1% and less than 100%. Cost loaded in the expenses field. How it can be solved to show earned value. Do I neeed any earned value setting? B...
Hi, Can any body tell me if my consultant asks to submit a MATRIX repeport. What actually he wants to sea in that?
Hi All Planners, ewcwntly i appeared in a job interview for the position of planning Engineer. The interviewer was the MD of the company and had a good knowldge of primavera. I am shareing these question (and the answers) to all my planet fellows. I...
Hi All Planners, ewcwntly i appeared in a job interview for the position of planning Engineer. The interviewer was the MD of the company and had a good knowldge of primavera. I am shareing these question (and the answers) to all my planet fellows. I...
Hi All Planners, ewcwntly i appeared in a job interview for the position of planning Engineer. The interviewer was the MD of the company and had a good knowldge of primavera. I am shareing these question (and the answers) to all my planet fellows. I...
To everyone please,I’m new in primavera. I just want to ask why is it that when I execute Update Progress in P6 the Actual Progress Duration will go back to each Original Duration, same as Baseline, even if the Actual Progress Duration is different ...
Hi Planners I want to share an interview question that was asked to friend of mine in an interview and he answered that wrong but the interviewer explained him the correct answer. The question was: If an activity is delayed by 4 days on February 28 h...
Dear All, My program is showing longest path in P6 , with some activties which has a positive float of 135 days also, as well as Zero days float. How could it be possible to generate longest path with positive float and zero float. Can anybody explai...
Dear All, Why dont we have a column to choose Baseline perrformance % complete in P6. How can we get a column to show this ?? Any ideas from any expert. regards, Haresh Jayanth
Hello,I am looking for standard man hours related to the high rise building design. I am working for a building company that won the bid for a tower (38 floors). We need to transform the bid drawings in building drawings but we are late and actually ...
What is Retained Logic & Override Logic, Some one please explain Thanx - Tanveer
is top down estimation possible even after actulizing activity ? regards saurabh
Hi all, When I exported project from p3,the resource type that assigned to the resources in P6 are not satisfactory,so I'd like to change the type of resources. Is it possible by exporting to excel. Thanks.
Hi all, What is the easiest way to assign the cost account? Is it possible by excel or global change? Thanks.
Hi all, How can I display the progress agaist the baseline bar?and summarize it? thanks.
hello to everyone, I need some help, this is the situation,why when I do printing for Microsoft program its apper ( THERES IS NOT ENOUGH MEMORY TO COMPLETE THE OPERATION ) even when I restart to my PC then reprint again nothing change i? Can you plea...
Dear All, Primavera P6 "While creating Resource Histogram by Using Resource Usage Profile (Resource Histogram), The X-axis is Time Scale (by Default) But Y-axis is coming in Hours (h) , i need it in "Numbers" Say Example, im generating Resource His...
Folks, who's got a clue how I can solve this problem... Thanks I imported a ver 6.7 project file into ver 6.2; it imported ok I tried to import some layout files (.PLF file) and got the error message ‘[QT_DAY=5]’ is not a valid floating point value ...