Good Time of the Day, I am looking to collect thoughts on keeping pipeline projects in P6 in order to allow forecasting for resources, revenue, between secured work and potential work (tenders, PQQ etc...) I believe it can be done in different ways. ...

Dec 8, 2010

New Planning Opportunities

Forum Topic

Hi Fellow Members, What are your ideas about new Planning Opportunities? Regards, Rashid

Dec 8, 2010

getting alert's from ms pro to the mail.

Forum Topic

  HelloI use version 2003 and wanted to know whether the software can send me an email for any task that needs to be done.Or send me an email when you reach a certain percentage.I know you can do this when working server versionThanks.

Dec 9, 2010

Import WBS Code in P6

Forum Topic

Hi everybody.. Can any one of you tell me that is it possible to import WBS Code from Excel to P6. Since we are working in WBS in 2 different system for the same programme, We want to import the data from one system to another.. We have tried by expo...

Dec 9, 2010

I need some information on a Water Pipeline Project

Forum Topic

Hi A Very Very Happy New Year to members of Planning Planet.I am a young professional in Planning & have never work before either on site or on a Planning & Scheduling. My goal is to become a successful planner & I got opportunity in my current organ...

Jan 2, 2011

Default Settings

Forum Topic

Dear Planners, My currency as I assigned in the program is "x", however when I close my project and open another project later has a different currency, close this project and open my project, the currency is changed to the last one. This always happ...

Jan 2, 2011

Changing Currency without changing the numbers

Forum Topic

Dear All I just developed a programme with resource and cost loaded, now the default of the currency was in USD, it should be in QAR, how can i change the currency without changing the numbers or figures (eg USD 10 to QAR 10)? Regards Alfon

Jan 3, 2011

Projected Time

Forum Topic

Dear Friends Anybody breif me about Projected time in Construction works. Iam not Famalier with the word projected time .....     With regards Arun.V

Jan 3, 2011

Projected Time

Forum Topic

Dear Friends Anybody breif me about Projected time in Construction works. Iam not Famalier with the word projected time .....     With regards Arun.V

Jan 3, 2011

Projected Time

Forum Topic

Dear Friends Anybody breif me about Projected time in Construction works. Iam not Famalier with the word projected time .....     With regards Arun.V

Jan 3, 2011

Copy a WBS from EPS to Another EPS

Forum Topic

HI Friends How to copy a WBS from one EPS project to another EPS project. and i want know that possible to view all project(whatever in the database) in WBS layout mode.

Jan 4, 2011

Copy a WBS from EPS to Another EPS

Forum Topic

HI Friends How to copy a WBS from one EPS project to another EPS project. and i want know that possible to view all project(whatever in the database) in WBS layout mode.

Jan 4, 2011

Hiding Activity Codes while filtering

Forum Topic

Hello Everybody:As we know the hierarchy while grouping the data in ms projects depends upon the ID of the code and not like primavera where the data is sorted on the basis of the order as secified in activity code.Now to attain this i creadted code ...

Jan 4, 2011

CAN'T PRINT 36" X 48" SINCE UPGRADING TO WIN 7

Forum Topic

When I want to create a pdf report to email the program will automatically resize the report to some sort of "fit to page" format during the "print" process, it will not let me change the size to 36" x 48", I am only trying to create the pdf to email...

Jan 5, 2011

P6 Installation

Forum Topic

Hai Can We install P6 Standalone & Server Based in Same System My P6.7 is Working with Server , I want Standalone to be install in my Desktop. Can We install P6 Standalone & Server Based in Same System.   Regards Anbin 

Jan 5, 2011

P6- In a 2 shift manhour distribution not seen.

Forum Topic

[[wysiwyg_imageupload:174:]]Dear All, I prepared the schedule for a shutdown & loaded with resources.Unit of time used is Hrs. & the calender used is 24/7.I wanted to view the activity distribution over the project time in 2 shifts,I selected the spr...

Jan 5, 2011

P6- In a 2 shift manhour distribution not seen.

Forum Topic

Dear All, I prepared the schedule for a shutdown & loaded with resources.Unit of time used is Hrs. & the calender used is 24/7.I wanted to view the activity distribution over the project time in 2 shifts,I selected the spread sheet on the top screen ...

Jan 5, 2011

Activity Percentage Complete vs Schedule Percentage Complete

Forum Topic

 I am working in a construction company and I prepared a cost loaded schedule but I am confused while updating of my schedule.Schedule Status:         Duration Type = Fixed Duration & Units                                % Complete Type = PhysicalWBS...

Jan 5, 2011

Level of Effort Percentage complete?

Forum Topic

Morning, Have a few level of efforts in my current plan.  Haven't used them for a while and I am a little confused to how  the 'LOE' updates its percentage complete in relation to it's predecessors and successors. I have one LOE with four activities ...

Jan 5, 2011