Search

Design Outputs

Forum Topic

Does anybody know where I can lay my hands on reliable output reates for the production of design drawings by CAD Operators, ie, how long does it take a CAD Operator to produce a Satge D architectural drawing? Any pointers gratefully received.  Andy

Sep 27, 2011

resource leveling0

Forum Topic

Hi guys deleted, figured out how to level with p6  

Sep 27, 2011

Time Saving Tips in Primavera P6

Forum Topic

Hi Guys,Here are six time saving tips in Primavera P6 Professional R8.1 http://bit.ly/pxO4fM If you know of some good tips, let me know and I can add them. Emily

Sep 27, 2011

Unable to open the P6 programs

Forum Topic

HiIs there any solution for the below problem which pop's up on opening any program  Database Server Error: Could not allocate space for object 'dbo.DLTACTV'.'ndx_dltactv_usession' in database 'pmdb$primavera' because the 'PRIMARY' filegroup is full....

Sep 28, 2011

Lost PRX. file

Forum Topic

Hie, can anyone help me on this ?I am not a planner but i know abit about P3.I found a program file in my planner computer. However, there no prx. file here.There is only 24 sub-files of the program.How can i open this program or how to create a prx ...

Sep 28, 2011

Asta Project Viewer

Forum Topic

Hi, I've received a copy of a Powerproject schedule and have been trying to locate a download of the Asta Project Viewer, but every link I find cannot locate the download on the Asta website. Have Asta withdrawn this software? If so, is there any way...

Sep 28, 2011

Planning Engineer, PMP,PMI-SP ( Dubai & Abu Dhabi)

Forum Topic

Hello my friends,   I would like to thank everyone here, PP is always best place to find solution to your planning and scheduling difficulties.   I am Planning engineer have more than 6 years of experience, I have developed my self in planning and ti...

Sep 28, 2011

Critical Path in MS Project 2007

Forum Topic

Hi Does anyone know how to display the critical path as a default setting Other software i have used shows the CP as a default I have used the Chart Wizard to display the CP but was wondering if there was a better way Any ideas welcome Thanks Regards...

Sep 28, 2011

P6 Cost Import Difference

Forum Topic

Hi Guys,I have been in stuck importing contractor's program for the last 3 days. I just moved to a new project. Anyway, i have been trying to import the contractor's programme however I am getting a totally different cost values. I checked the curren...

Sep 29, 2011

Time at Large - An alien concept in India

Forum Topic

Hi Delay Experts I have a classic case of time being set at large in a delay claim in India. I would have no problem promoting this in UK but nobody seems to have heard of the process in India. I can also demonstrate that the situation is covered by ...

Sep 29, 2011

Free Float

Forum Topic

Hello, We need to show the free float, but only the free float of the activities, no the free float of the milestones, resume bars etc. We have been trying some things but is not possible for us, Can someone help us?   Thanks

Sep 29, 2011

Assigning Contractual Payments

Forum Topic

Hi there all,In P6, I'm trying to assign the contractual payments of a purchased equipment but I could not find a satisfactory way to represent the situation. Let's say, I am planning to purcha an eqp. A which has the following activities according t...

Sep 29, 2011

Maintaining baselines

Forum Topic

Hello Just a quick Question regarding baselining my project. When I schedule my project and then I baseline it with that data date. If I then update the project plan and schedule it with a new data date and baseline it again is it possible to go back...

Sep 29, 2011

P6 Filtering by WBS Error

Forum Topic

Has anyone come across a "WBS filtering glitch" wherby an error pops up as per below. WBS does not contain any characters other than numbers and letters so the error should not be occurring? The error seems to have started up since installing the new...

Sep 30, 2011

P6 Filtering by WBS Error

Forum Topic

Has anyone come across a "WBS filtering glitch" wherby an error pops up as per below. WBS does not contain any characters other than numbers and letters so the error should not be occurring? The error seems to have started up since installing the new...

Sep 30, 2011

Earned value on completed activities

Forum Topic

Hi, Im looking at conducting earned value without any sort of formal company proceedure and i thought i would get your opinions? We have some activities in our schedule that will be actualised even though the work has not been fully completed. This i...

Sep 30, 2011

Accepted Programme

Forum Topic

I have just had a programme accepted by PM but it is qualified with various wording, one being that a certain activity should link to planned Completion (I should mention that the PM has instructed that works not affecting the opening of the scheme c...

Sep 30, 2011