What shall the Planner consider when contractually "Float time is accrue to the Owner"
Forum TopicWhat shall the Planner consider when contractually "Total and free float; float time shall accrue to the Owner and to the Owner's benefit"
What shall the Planner consider when contractually "Total and free float; float time shall accrue to the Owner and to the Owner's benefit"
dear i have 3 years QA/QC engineer. now i have done p6 traing and want to become planeer engineer.plz tell me how i prepare for interview . plz suggest some questions
Spider has a nice feature of probabilistic analysis of project completion date, cost etc. It is based on optimistic, pessimistic and most probable schedule scenarios.It is clear, that probability to meet optimistic scenario is 0%, pessimistic is 100%...
Anyone have a sample of a detail technical specification for Scheduling, please forward a copy to my email address use private message service Thank you. Regards, Marie Albert
I need some assistance about progress percentage in P6. I want to know that how can compare my baseline (Planned) progress and current progres percentage in P6. I understand the concept of three types of individual activity percentages i.e. Physical,...
Hi, I have recently moved to P6 from MSP and therefore havea only a basic knowledge of P6. I am preparing a schedule for a massive shopping mall (2basements + 4 shopping floors +2 parking floors) and i wanted to know what level of activity codes need...
Afternoon all, Quick query re reporting in P6..... Is it possible to run a report which shows all the activities that should have been progressed in the previous period but have not been? I.E Basically at the moment I am filtering the P6 plan to sho...
Hello everyone! We just release a new blog discussing how to use color-coded activity codes on the Timescaled Logic Diagrams in P6 R8.2. Follow the link to read! http://mssprojectsanalytics.com/blog/bid/239784/Primavera-P6-Release-8-2-TSLD-with-Color...
Can any body send me resource loaded p6 plan for any shutdown job on ([email protected])
Hi, Hoping someone can help. I was wondering if MSP 2010 has the capability to show an "composite" timescale on the Gantt charts? By this, I mean something akin to P3 where you can showthe main timescale for the project duration on say a quarterly ba...
I got problem in lag when I was importing from .DBF file. I am getting only two digit onwards, but I’m not getting single digit (from 1 to 9) in import. And I tried with decimal (like 3.00) places also and even two digits (like 03). Not able to impo...
Hi Guys, Here's a free download with no registration! A 40-page step by step guide on how to Integrate Deltek Cobra Client/Server (and n-Tier) with Oracle Primavera P6 http://ow.ly/f3SNH I hope you find it useful. Emily
I made a P6 plan on the basis of manhours now i want to make a S-Curve on excel for manhours weight% vs time for daily progress monitoring.
I wish to use MS Project to manage my part-time MSc(Res)/PhD course over the next 5-6 years. I've had some basic experience using MS Project for routine IT project management, but it's not obvious how to handle some of the non-standard aspects of a p...
I have amended some activities on the restored baseline and the dates are all accurate. When I then assign the baseline back to the main plan a couple of the baseline dates change back/ close to the data date. This only happens to a couple of activ...
Dear friends, Activity 1 ---FS---- Activity 2 Activity 1 - Start date 25 jul-2012Finish Date 16-aug-2012 Later i clicked the check box for Actual start date - 29-jul-2012 and Actual Finish date as 31-aug-2012 Activity 2 - Planned start is 17aug-2012P...
please anyone can help me i need 1 sample project of building construction
Dear P6 experts;I wanna adding some ressources on my P6 project, this ressources is the subcontractor team, so if I add this team as labor, I can't assign a unit of mesure (m3 or lm,..) wich are the units on the subcontractor contract.Please if any o...
Looking for some help: I am trying to ‘straighten the progress line’ in Microsoft Project. I am looking to establish the projected end date of activities and projected end date of the project following the input of progress. I have tried to use the f...
Hi Guys,Instantis was acquired by Oracle this week - What does this mean for Primavera? http://ow.ly/fbpgJEmily