Need Sample schedule for Power Plant Simple/Combined Cycle (PM5/PM6)
Forum TopicDear all, If any one had sample schedule especially Simple / Combined Cycle for Power Plant, please send to my email : [email protected]. Thanks
Dear all, If any one had sample schedule especially Simple / Combined Cycle for Power Plant, please send to my email : [email protected]. Thanks
please if any body having the sample baseline schedule of precommsioning, commissioning and start up.its very urgent iam having only activity list details subsystem of petrochemical plant
Just upgraded from 8.53 to 8.7.1 and tried to install the Capex module and Cost Loading modules - no joy. The Risk Factors module seems to be pre-installed. I cannot say that I ever used either of the modules, but curious if anyone else has and if...
I have a P6v7 schedule created with the cost for each activity as a resource (rather than Expense, so that it can be used to create an SDEF for QCS input). The 'calculate costs' and 'auto compute' ticky-boxes are ticked. When I update the activity pe...
Cannot get database to backup. Went to Programs/Orarcle Database 10g Express Edition/Backup Database and get the following error message: Backup of database failed Unknown log mode: SP2-0640: Log file is at SP2-0640 Can someone give direction on ho...
We are on a mission to discover the origins of Rolling Wave planning – where did the idea come from? Who used it first?? Is it an EV concept borrowed by schedulers or the other way round??? Any ideas or authenticated sources would be appreciated...
I am now facing a problem in squeezing my project. My programe have over 4000 thousand activities and some activities have over 10 predecessors or successors. The programme have multiple critical paths. There are so many combination in squeezing the ...
Why progress Line show only delays, why don't show advances?
Estimados,Deseo ingresar cantidades en el MSProject, la forma hasta ahora en que he podido realizarlo es creando un recurso llamado cantidad (Qty) y que luego el project me muestra la cantidad/dia , de manera similar . Existe otra manera de hacerlo? ...
Oh Hi I am new into this forum and i am going to embark a new journey as NEC contract planner , can someone please guide me the bullet points for the NEC we use in Project PlanningThanks
Oh Hi I want to know my NEC contract and from some discussion on this forum i understand 1) This is New Engineering contract and created to resolved disputes when things goes wrong mainly in construction contract.2) It clearly define the responsibil...
Guys, Just like to know how can i add some note to the scheduled output (printout) prior to printing, putting in notes in the notes tab doesn't reflect the note or message conveyed on the final printout. Or how do we put footnotes in the schedule pri...
Hi Planners, I have assigned the baseline to my existing current project & then i want to update the baseline with their dates & duration. But while i select the Update option it shows that the Event code error occurred & cannot upd...
Long time since I posted anything on here, but stuck at the moment Have been carrying out schedule risk analysis on a schedule with multilpe calendars, 5 day, 6 day and weekends only. Pertmaster runs and shows up an error message stating check Sched...
Can some help with this? I just joined the oil & gas industry and would like to pick-up some guide lines on WBS for oil refineries, pipe line, and off-shore structure. Any suggestions? Would appreciate it very much.
Hi everyone,who had taken part in the PTA or Nylon project? And can give me a copy of the peoject plan to learn it? my E-mail: [email protected] .thanks a lot.
1 Project Management Institute (PMI) 2 Construction Management Association of America (CMAA) 3 American Society for Engineering Management (ASEM) 4 Society of American Value Engineers ...
Dear All, What the best method to issue Recovery Schedule using baseline and update are already exist in step
Online scheduling is the usage of competitive analysis (or online algorithms) on scheduling problems. Online algorithms is characterized by making decision "online", which means a point in the time axe. In this point of time, we can not see the futur...
Hello, Jeff, --STEP-BY-STEP GUIDE USING SDK IN SCHEDULE PREPARATION--by Jeff I read your Topic as following, but now has been LOCKED. http://www.planningplanet.com/forums/primavera-version-pm5-pm6/422180/step-step-guide-using-sdk-schedule-preparatio...