PRA Cost Roll Up

Forum Topic

Hi,In the Risk Outputs tab of PRA, the P50 cost does not seem to roll up properly. For example the sum of the P50 costs of activities do not always equal the P50 cost of their WBS element, and the sum of the P50 costs of WBS elements does not always ...

Aug 27, 2015

Can you create codes in the Library Explorer to remain permanent?

Forum Topic

Hello everyone,At the moment when I create a programme I create codes so that I can apply it to the bars.However when I open a new project it seems that those codes dont come up in my "project view"They re appear when I open up the project that I cre...

Aug 27, 2015

MSP 2013 - Filters for 3wk and 12wk lookahead

Forum Topic

Morning All, I am trying to create  layout/filter in MSP 2013 for a 3wk and 12wk lookahead. I dont seem to be able to use the easy logic for creating the same rules that i use in P6 in MSP. Typically I would us CD (Current Day) +/- period of time (in...

Aug 28, 2015

It has been an interesting week for my family.

Forum Topic

Hi AllThis week has been interesting:My grandson has a job as a deck hand on a small drift trawler in the North sea. On Tuesday it sprung a leak and he had to keep bailing while the skipper rushed to the beach.On Thursday my grand daughter was accept...

Aug 29, 2015

Filter projects in EPS by milestone status

Forum Topic

I (as well as my company) am new to running P6, and have what should be a basic question.  I have searched the internet and have come up empty.  What I want to know is if I can filter projects in the EPS window based on milestone status.  Now I know ...

Aug 31, 2015

How to reschedule??

Forum Topic

Intially the project finish date was 30April 2016, Because of the Penalty milestone, dates have been prepon to Dec 2015..so how to fix this in p6???

Aug 31, 2015

Updating Problem

Forum Topic

Dear all, I want to be updating percentage comple so I rename the "Performance %Complete Colum" as , but when I try to enter a value, it only display 6%, no matter the value it will display 6%.Please help solve this problemThanks

Aug 31, 2015

total negative float

Forum Topic

Dear All,My name is faizi imam and i am working on revising a beseline schedule to claim for EOT.After revising the schedule i got the new project completion date in the summary but i am not getting total negative float,instead i am getting total flo...

Aug 31, 2015

Resource Max units / time

Forum Topic

I am using P6 Professional 8.3 and I'm having issues with the Resource - Max units / time allocation. I enter an effective date to start assigning 8 hours per day (Max units / time) for a activity, and then another effective date later on to start as...

Aug 31, 2015

Productivity for Building MEP services

Forum Topic

Hi Everyone,Please someone post the productivity of manpower for different services like, Water supply, Drainage, Chilled water supply, fire fighting, elctrical works etc for building construction project.

Sep 1, 2015

Primavera P6 Level Of Effort Activity Type

Forum Topic

Quite a few folks have been asking about how and when to use Level Of Effort activities in Primavera P6, so we though we would make a short movie explaining how they work. http://ow.ly/REuDC

Sep 1, 2015

Progress Calculation

Forum Topic

Hi All, In MS Project is it possible to remove the link between percentage complete and remaining durations.the concern is that based on the assigned emaining duration the achieved/inserted % progress is changing. MS Project is calculating the progre...

Sep 2, 2015

Convert Activity Code into WBS

Forum Topic

Hello Planners,is it possible to convert Activity Code into WBS entries? I have tried to write a Global Change saying "WBS = ", but the value can only be one of my WBS nodes.Thank you,Alexandre

Mar 23, 2016

How to load MS Project .mpp file to p6

Forum Topic

I have a schedule  done in MS Project thats in .mpp format. I tried to load the schedule into p6 but it accepts only XML. I converted the file format to XML but of no use. Could anyone shed a light on how to load this into p6

Mar 23, 2016

Is there a benefit to a frequent Primavera P6 upgrade?

Forum Topic

How often would you upgrade your P6 to the latest version? I know people that refused to upgrade and they are still using P6 v6 and it works perfect for them. They are basically doing the same job I am doing with my v15.2. It appear that primavera ma...

Mar 23, 2016

Activity Spreadsheet Usage / P6 V8.2

Forum Topic

Hi everyone,Right now I’m doing a contract migration from Lump-sum to Time & Material, I updated my schedule once a week but now my client need the number of hours expended by day.  Throw the Activity Spreadsheet Usage I can found all the information...

Mar 23, 2016