FIDIC 1987 Clause 13.1

Forum Topic

Dear Sirs,This is my first request for your thoughts on below matter:Our Contract is based on 4th edition of FIDIC 1987 as further amended in 1992. Broad changes made by way of Conditions of Particular Applications. It’s a re-measurement contract.We ...

Sep 14, 2011

Resource Usage Profile

Forum Topic

Guys, I have developed a schedule in P 6.0, with resource loading. Following is the problem I am facing when viewing the Resource Usage Profile. The calender for both activities and resource selected is common 7 x 24 hrs. I have say a resource mason ...

Sep 14, 2011

Summary Task % Complete

Forum Topic

I applied dummy resource & unit cost, it is giving schedule % complete & actual % complete in the summary task  , i tried to find out the basis of this summary task % complete, coulld not find the base, Please advise me experts....what is the formula...

Sep 14, 2011

TWO Shifts

Forum Topic

Dear Friends I have completed the base program for my new project & I loaded the resourse also... Just now I got the call from my manager to reduce the duration and make an accelarated program. I know that by reducing the duration and increase the ma...

Sep 14, 2011

How to handle material cost in P6

Forum Topic

Hi Ladies and Gents, I have imported a Bill of Material into my projectplan under WBS section purchasing. I want to allocate planned material costs to each item as they are procured and track the delivery to site. It seems I cannot input planned mate...

Sep 15, 2011

Default units/time change while importing

Forum Topic

Dear Firends,We are working in Oil & Gas EPC Project in the Middle East.We are facing a strange problem(!) with Primavera 6.0 Release 7.0.0.When we imported a project it shows defaults units/time as 1/d for all labor resources. But when when the same...

Sep 15, 2011

Default units/time change while importing

Forum Topic

Dear Firends,We are working in Oil & Gas EPC Project in the Middle East.We are facing a strange problem(!) with Primavera 6.0 Release 7.0.0.When we imported a project it shows defaults units/time as 1/d for all labor resources. But when when the same...

Sep 15, 2011

does anyone have an idea about CNFF\-3348-2 error?

Forum Topic

Hi all,Previously, I have created a forum topic related to this issue but unfortunately I could not get any satisfactory answers. That's why I felt like consulting to the forum once more.When I try to import a XML file created by MSP to P6, I get thi...

Sep 15, 2011

MSP 2010 - User-Controlled Scheduling

Forum Topic

Dear fellow PP members,With the introduction of MSP 2010, Microsoft came up with a new feature called “User-Controlled Scheduling”.Since this name suggests that -until now- users had no control over a MSP schedule whatsoever, I immediately started to...

Sep 15, 2011

Shutdown schedule MS Project

Forum Topic

Hi all, I am looking to network with other Shutdown Planners/Schedulers working on Gas Production Plants

Sep 16, 2011

P6, Resources duplicated during import

Forum Topic

Hi All,I am facing problem while importing XER. While importing XER, by selecting "Update Existing Project" with "Default Import Configuration", some labour resources are assigned twice to activities.Can anyone please help to solve this issue....Than...

Sep 16, 2011

Where are the Moderators

Forum Topic

Good Morning Gary Whitehead and I are the only moderators actively working on the planet. Where are the rest of you guys? Regards Mike T.

Sep 16, 2011

Urgent, Continuous Programme Refusal......

Forum Topic

The programme has been refused several times refering to clause  and 31.2 31.3 and 32.1 respectively.. HAs anyone been in this kind of situation where the issued programme is continuously not accepted.... Any IDEASSSSSSSSSSSSSSSSSSSSSS

Sep 16, 2011

Gantt chart showing ERP system implementation project

Forum Topic

I realy need a "Gantt chart showing ERP system implementation project by ASAP methodology", Is there anyone can share a MSP file, in this field?I need some information about A-SAP implementation steps such as WBS, Time scheduling, activity relationsh...

Sep 16, 2011

Resource Type related

Forum Topic

Dear Friends,When I received the .xer file from my subcon, some of the 'non-labour' resources as assigned as 'material'. When we tried to change this, the program doesn't allow to change cautioning that this may affect other project which the resourc...

Sep 17, 2011

Critical Path Change

Forum Topic

Hello All,I have just come accross an issue that i never faced before.I have Planned a project and after finalizing the baseline when I updated it on the current data date,The critical path has transfered to Non.Critical.Now there is no critical acti...

Sep 17, 2011

What constrainst in p3?

Forum Topic

 Hi, the project finish date is almost 2 years delayed, which constraint shall I use in P3? The data date after I put the constrainst will be the project start date. When I use the mandatory constrainst, the total float will be zero for that activity...

Sep 18, 2011

What constrainst in p3?

Forum Topic

Hi, the project finish date is almost 2 years delayed, which constraint shall I use in P3? The data date after I put the constrainst will be the project start date. When I use the mandatory constrainst, the total float will be zero for that activity ...

Sep 18, 2011

resource smoothening

Forum Topic

Hi friends,Anybody please explain defference between resource smoothening and resource levellingRegards.Sunil

Sep 18, 2011

Claim analysis

Forum Topic

Hi friends,Anybody explain the most important things to be considered while doing the claim analysis.RegardsSunil

Sep 18, 2011