Search

unit/time

Forum Topic

Hi friends, I want to change resource unit/time into decimal. In my system default value 1 is coming how can I change to 0.3 etc.. Regads, Sunil.

Jun 14, 2012

additional work

Forum Topic

Hi All,I was told by the client to proceed to carry out the additional work by verbal instruction and i have check with my PM to me to proceed and the commercial will talk later. I feel something wrong? is it the right thing to proceed without agreei...

Jun 14, 2012

Setting up an Oracle ODBC Driver and Data Source

Forum Topic

Setting up an Oracle ODBC Driver and Data Source requires more steps than the Microsoft SQL Server database setup. This article explains the steps including tnsnames.ora configuration. http://bit.ly/KGG0JQEmily

Jun 15, 2012

P6 v7 Opening Project in Exclusive Mode (Grayed Out)

Forum Topic

I have a project stuck in "shared" mode.  The "exclusive" mode option is not available though I am using a stand alone version of P6 v7.0 as an admin with full access. This is the only project with this issue.  I have tried all forms of logging out, ...

Jun 15, 2012

A bit of guidance needed

Forum Topic

Hi,Im working on a project that has been delayed considerably, and i have been exposed to claims for the first time. With no planning manager to speak of i have a couple of questions.The client has rejected a disruption claim as all the burned hours ...

Jun 16, 2012

SDK

Forum Topic

Anyone has guide to SDK?   I tick SDK piror to installation but couldn't activate it.

Jun 17, 2012

Programme, S curve Manpower Histogram

Forum Topic

I understand that upon approval of baseline, it seves as a contractual document. How about S curve and Manpower histogram ? Does it constitute of a committment to comply with the manpower, equipment and performance aspect? Does it work against us if ...

Jun 17, 2012

Project Protofolios Management / Database Management

Forum Topic

hi All;Rafael Davila  &   Mike Testro Specially;Sir I was working in a small organization and as an individual planning engineer for last 2 years.Now I have got a job in a Europian firm as senior planning Engineer.Today was my first day and my manage...

Jun 17, 2012

Looking for job as planning engineer

Forum Topic

 Dear Sir  I'm Planning Engineer, I’am looking for a job as Planning Engineer.Dear sir please notes that my availability is immediate, and about my daily rate/salary expectation is negotiable. Best Regards Email :[email protected] Tel   :00213...

Jun 17, 2012

Progress Line

Forum Topic

Is it possible to update / move the progress line without showing the actual progress (spotlight progress). i.e to turn the spotlight off. I don't want to re schedule, just change the data date without showing the spotlight.  I am using P6.v7 Thanks

Jun 18, 2012

The Barometer on Change: 5 Themes for Change

Forum Topic

Hi Guys,Moorhouse has recently released the results of their survey into what is driving change and how effective it is.Here's out take on it http://bit.ly/KNyhtFColin

Jun 18, 2012

Man Power Histogram

Forum Topic

Dear AllCurrently I am handling a project having a one month delay ,I want to prepare man power histogram , The histogram i prepared is based on Baseline and now it is not reflecting the exact   situation of site due to delay1. Is it possible tp prep...

Jun 18, 2012

Man Power Histogram

Forum Topic

Dear AllCurrently I am handling a project having a one month delay ,I want to prepare man power histogram , The histogram i prepared is based on Baseline and now it is not reflecting the exact   situation of site due to delay1. Is it possible tp prep...

Jun 18, 2012

Critical Activities

Forum Topic

Dear Planners,I am producing time scheduling for Pipe manufacturing, it is production line and the schedule is EPC (Eng. Procurement and Construction) the size of critical is massive as most of the activities are critical, is this right?Regards,Mouta...

Jun 18, 2012

PM6 level resource

Forum Topic

Hi, Can Primavera (P6V7.0) level ident (parent/children) resource? Per example: Resource level 1: Unit maximum manhours; 50h/h Resource level 2: Electrician maximum manhours; 20h/h Resource level 2: Welder maximum manhours; 40h/h Resource level 2: pi...

Jun 18, 2012

Cumulative late curve

Forum Topic

Dear All, How can we generate a cumulative late curve from the resource usage spread sheet in P6. Your valuable remarks are highly acceptable.. Regards. Sunil.

Jun 19, 2012

Resource Lag

Forum Topic

Hi guys, How do I put a lag in a specific resource? Example is I have an activity with 10 day duration. A resource will be introduced half-way (after 5 days) up to completion of that activity. In P3 it was very simple. How about in P6? Thanks.

Jun 19, 2012

Merging Multiple projects into one project

Forum Topic

Hi;I have got separate schedule for Procurement,mobilization and construction from our sub-contractors.How to make these all as one project? Regards

Jun 19, 2012

Organogram in P6

Forum Topic

Hi ,I have one question...In P6 , lets suppose i have multiple projects , Every project has its own organizational hierarchy (OBS)..... and for example i select one project and only want to take out the print of this projects hierarchy (not all) ... ...

Jun 20, 2012