Be able to apply the various communication media, knowing which media should be used to effectively communicate the cost estimate or the performance measurement baseline including updates to the relevant stakeholders in a timely manner enabling them to make the appropriate decisions
Be able to analyse the cost estimate or the performance measurement baseline including updates data the write a narrative report appropriate for each category of stakeholder
Be able to determine what information needs to be included in a cost and resource loaded schedule in order for it to b
Is able to identify and quantify risk impacts, prioritize those risks then demonstrate and explain how risks can be mitigated or otherwise be incorporated into the CPM schedule, facilitating decisions from the relevant stakeholders
Be able to analyse the risks and uncertainty, then calculate the appropriate contingencies for presentation to and decisions by the relevant stakeholders
Be able to set up and run a Monte Carlo simulations, be able to read and understand the outputs from a Monte Carlo simulation and based on those results make the appropriate recommendations
Can identify the various types of interfaces that can and do exist between work packages and activities, create or make those logical connections, to ensure that we have horizontal traceability in terms of cost
Can identify and apply the various tools/techniques that we can use between work packages and activities to ensure that we have vertical traceability and that our schedules can "roll up" or "roll down" without losing activities or work packages, and be able to explain/justify/rationalize the use of that tool/technique to the relevant stakeholders
To be able to test/validate assumptions and conduct sensitivity analysis using the appropriate tools/techniques and then apply the results in drawing conclusion, making decisions or recommendations to the relevant stakeholders
Be able to set up and run a Monte Carlo simulations, be able to read and understand the outputs from a Monte Carlo simulation and based on those results make the appropriate recommendations to the relevant decision makers
Is able to analyse the Bills of Quantities or Bills of Materials, including those coming from BIM, perform a "reality check" to see if they appear accurate, precise and reliable then use the BoQ/BoM as inputs in calculating both costs and durations
Is able to analyse the estimating parameters, and based on the scope definition, the acceptable ranges of accuracy and which estimating tools/techniques are appropriate for this class of estimate, then apply them to create a cost estimate/budget which meets the Level 5 accuracy ranges
Is able to facilitate and lead a cost estimate development meeting, including determining who should attend and what the role/responsibilities of each participant should be
Is able to apply value analysis/value engineering tools, techniques or methodologies as appropriate and be able to apply the results of the VA/VE in drawing conclusion, making decisions or recommendations to the relevant stakeholders
Is able to determine what the appropriate level of detail should be fo
The Specification is full of errors and is biased in favor of specific software.
Just take a look at a few sections, it is a disaster.
2.1 SOFTWARE - 2.1.2.2 Other Than Primavera - If the contractor chooses software other than Primavera P6, that is compliant with this specification, provide for the Government's use two licenses, two computers, and training for two Government employees in the use of the software. These computers will be stand-alone and not connected to Government network. Computers and licenses will be returned at project completion.
As a dynamic professional I have worked on different projects like, Infrastructure, Airports, Real estate and Marine construction. I have experience and knowledge of procedures, construction methodologies and method statements.
My job profile includes developing and maintain an update Master Schedule in order to meet client expectations, optimizing resources assuring the completion of project safely, on time and within budget.
As a dynamic professional I have worked on different projects like, Infrastructure, Airports, Real estate and Marine construction. I have experience and knowledge of procedures, construction methodologies and method statements.
My job profile includes developing and maintain an update Master Schedule in order to meet client expectations, optimizing resources assuring the completion of project safely, on time and within budget.