Dear PP Friends
I need your feedback in regards the following question
- What is the definition of Front loaded & Back Loaded Resource Curve.
- which resource curve will give correct progress status.
- To get the resource curve I have to load from global Resource curve to each resources.
- The last how I will get S-curve,
for that I shall be very thankfull to all of you
Dear You reply me or you asked quetion
Q1[[wysiwyg_imageupload::height=422,width=291]]
I DID'T GIVE ANY DURATION SO HOW PRIMAVERA ASSING THE DURATION?
Q2
DIFFERENCE BETWEEN START & FINISH IS 4 WHILE IT SHOWING DURATION 9
Q3
ALSO HOW IT CALCULATE THE TOTAL FLOAT
Q4
IS MY ASSINGING OF RELATION BETWEEN THE ACTIVITY IS CORRECT OR WRONG
Q5
WHAT IS THE BEST WAY TO ASSING RELATION SHIP BETWEEN ACTIVITIES.
Q6
IF I WANT TO MAKE THE ACTIVITY A1112 CRITAICAL SO WHAT I DO FOR THAT PURPOSE?
Q7
WHAT IS EASIEST WAY TO DRAW THE CRITICAL PATH IN PRIMAVERA 6?
Q7
HOW THE STAR ASSOCIATED WITH DATES ARE REMOVED?