Front loaded & Back Loaded Resource Curve

Dear PP Friends

I need your feedback in regards the following question

  1. What is the definition of Front loaded & Back Loaded Resource Curve.
  2. which resource curve will give correct progress status.
  3. To get the resource curve I have to load from global Resource curve to each resources.
  4. The last how I will get S-curve,  

for that I shall be very thankfull to all of you

P
planning engineer 👤 Member for 14 years 9 months

 

Q1[[wysiwyg_imageupload::height=422,width=291]]

I DID'T GIVE ANY DURATION SO HOW PRIMAVERA ASSING THE DURATION?

Q2

DIFFERENCE BETWEEN START & FINISH IS 4 WHILE IT SHOWING DURATION 9

Q3

ALSO HOW IT CALCULATE THE TOTAL FLOAT

Q4

IS MY ASSINGING OF RELATION BETWEEN THE ACTIVITY IS CORRECT OR WRONG

Q5

WHAT IS THE BEST WAY TO ASSING RELATION SHIP BETWEEN ACTIVITIES.

Q6

IF I WANT TO MAKE THE ACTIVITY A1112 CRITAICAL SO WHAT I DO FOR THAT PURPOSE?

Q7

WHAT IS EASIEST WAY TO DRAW THE CRITICAL PATH IN PRIMAVERA 6?

Q7

HOW THE STAR ASSOCIATED WITH DATES ARE REMOVED? 

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts