Pull Planning

Do you think that a pull planning forum would be of value here at PP ?

A
Alexandre Faulx-Briole 👤 Member for 23 years 5 months

Hi there,

I would like Critical Chain and Resource Critical Path!

When, in 1999/2000, the former LeBihan Cie (now Sciforma) introduced the Critical Chain Planning with the software Planning Scheduler (PS) 8, I became really enthusiastic about it.

Alexandre

R
Rafael Davila 👤 Member for 22 years 3 months

Why not another forum for:

• Last Planner

• Lean Planning

• Rolling Wave Planning

• Production Planning

• Success Driven Project Management

• Critical Chain Project Scheduling

• Precedence Diagram Method (PDM)

• Activity Diagraming Method (ADM)

• Critical Path Method (CPM)

• Resource Critical Path (RCP)

• Time Risk Allowance

• Relationship Diagraming Method (RDM)

• Earned Value Management (EVM)

• Earned Scheduling (ES)

• The Fly by Night Scheduler method

• The Last Buzzword Method

Why not keeping the discussions under some of the existing one that fits the originator's target audience.

Forum Sponsor

Top Posters

Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts