One Resource Across Multiple Departments

I just started with an engineering company that needs some real help with their scheduling system.

The first priority is being able to produce a staffing plan from the schedule. The issue I'm running into is that our Instrumentation and Electrical group shares resources. Joe Schmo could work 10 hours on Electrical work and 30 hours in Instrumentation work. I need a way to track Joe Schmo's total hours but also separate out his work in the two different departments.

What is the best way to do this within P6?

Z
Zoltan Palffy 👤 Member for 16 years 11 months

make it a global resource and then also use roles so you can assign Joe Shmoe. 

R
Raymund de Laza 👤 Member for 16 years 6 months

For example, Create a Resource Calendar setting the Time 8am-6pm every M-W-F (Department 1), 8am-1pm every T-Th (Department 2).

 

Forum Sponsor

Top Posters

Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts