Understanding the Primavera P6 – USACE Mandatory Requirements

The United States Army Corps of Engineers (USACE) has mandatory requirements for the submission of all Oracle Primavera P6 Professional schedules. Here we take a look that these requirements and better understand their purpose and benefits http://ow.ly/3VH730avzEW

R
Rafael Davila 👤 Member for 22 years 3 months

Memorandum: Use of Brand Name Specifications

Brand Name Specifications is frequently done by corrupt officials who take advantage of monopolistic practice, perhaps by taking some bribery.

It looks like USACE is bypassing the rules; in any case justification for Brand Name Specifications must be done on a case by case, for each individual contract.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts