Primavera P6 Professional Resource Lag Quick Tip

What if you want to delay the start of one resource working on an activity? Yes, it is possible in Primavera P6 Professional to add lag on a resource. Here's how http://ow.ly/nzwu309MjEl

R
Rama Chandran 👤 Member for 14 years 6 months

Hi

I need solution for this problem in Primavera.

This is related to Manufacturing Planning works.

Activity A - Machining

Activity B - Machining

Activity C - MAchining

Activity D - Machining

Activity E - Machining

Activity F - Machining.

Machining operation will be done by any on of the machines ( Lathe 1 , Lathe 2 , Lathe 3). After proper link , whether in primavera possible to assign the machines to the activities based on operation which gives better result.

Any one help.

 

Regards

Ram

 

 

R
Rama Chandran 👤 Member for 14 years 6 months

Hi

I need solution for this problem in Primavera.

This is related to Manufacturing Planning works.

Activity A - Machining

Activity B - Machining

Activity C - MAchining

Activity D - Machining

Activity E - Machining

Activity F - Machining.

Machining operation will be done by any on of the machines ( Lathe 1 , Lathe 2 , Lathe 3). After proper link , whether in primavera possible to assign the machines to the activities based on operation which gives better result.

Any one help.

 

Regards

Ram

 

 

Forum Sponsor

Top Posters

Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts