Automatic opening of rolled-up WBS-level when using "GoTo" for relationships

B
Bo Johnsen 👤 Member for 20 years 3 months

When analysisng predecessors and successors I often roll up my programme so only a few WBS-levels are shown. I then open that WBS-level where the activity I want to analyse is located in.

When pushing either the "GoTo" for the predecessor or successor panels in the "Relationships"-tab at the bottom, I would like the WBS-level to open automatically and show the pred./succ.-activity, however that doesn't happen.

I can of course push "Expand All" under the View-tab and it will then automatically jump to the pred./succ.-activity, but then the whole programme will be shown again and I can start all over rolling up WBS-levels until I get what I want to see again. A lot of time wasted.

Is there any settings or short cuts to only open the WBS-level where the relevant pred./succ.-activity is located in.

 

Best regards,

Bo 

P
Paul Harris 👤 Member for 25 years 2 months

Bo

I am fairly sure you will not get this from P6.

Regards



Paul E Harris

BSc Hons, Certified Cost Engineer, PRINCE2 Practitioner

Managing Director and President

Eastwood Harris Pty Ltd, Australia

http://www.eh.com.auhttp://www.primavera.com.auand http://eastwoodharris.com.

Project Control Consultants and Planning and scheduling software book and training material publishers

Primavera P6 Version 8.3 eLearning available from http://www.primaskills.com.au/project-management-training/

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts