One of the reasons that P3 doesnt have an undo button is because it is a multi-user application. What you may want to undo chould have been changed by somebody else in the meantime; invalidating your undo action.
So in order to make this (really) work you would need to build quite some rigor/logic under that undo button.
For the very same reason it took a while before an undo button appeared in P3e/c/TeamPlay/IT Project Office/Project Management. (release 5, just announced)
Incidentally, it has nothing whatsoever to do with P3 being 16 bit. Its to do with the database architecture, most people who used pre-windows software didnt have an undo feature anyway, so dont miss it.
Because Real planners don’t make mistakes. They don’t need to redo/Undo their work. P3 noticed this quality in planners and made a decision that a UNDO button would not be required because it will not be USED.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Im afraid Ron is right.
P3 is frozen and will not have any upgrades.
One of the reasons that P3 doesnt have an undo button is because it is a multi-user application. What you may want to undo chould have been changed by somebody else in the meantime; invalidating your undo action.
So in order to make this (really) work you would need to build quite some rigor/logic under that undo button.
For the very same reason it took a while before an undo button appeared in P3e/c/TeamPlay/IT Project Office/Project Management. (release 5, just announced)
Hope this helps.
Niek.
Incidentally, it has nothing whatsoever to do with P3 being 16 bit. Its to do with the database architecture, most people who used pre-windows software didnt have an undo feature anyway, so dont miss it.
No, P3 will never have an undo feature. Primavera has announced that have frozen all feature enhancements for the P3 product.
The other Primavera product, P3ec, P3e, Teamplay will be receiving the undo feature with their upcoming release of Version 5.
New version of primavera (ver.5.0) has this undo feature. Its due to be released sometime in April 2005. Hope this solves all our problems.
thankx
Because Real planners don’t make mistakes. They don’t need to redo/Undo their work. P3 noticed this quality in planners and made a decision that a UNDO button would not be required because it will not be USED.
Hi Sukumaran Subaramaniyan,
P3 is only a 16 bit programme, which limits its ability in its software construction to be able to "undo" input.
Paul