how can i obtain s curve
Forum Sponsor
Top Posters
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts
Hi to all
In the tools ,option , graphical reports there will be choices early & late, select which ever you need
use tabular report tabular
or use graphic report with labels
how to set up S-curve in P3 obtaining Late Dates using tabular reports resouce loading?
Yaser,
Because the metrics is meaningless it does not matter how you update, anyway it will still be nonsense. You can use a single resource a single activity that span the whole job duration, assign a predefined curve and you will get equally invalid measure with less effort, if this is the idea. With P3 you will get a meaningless S-Curve with early and late dates at the click of the mouse, at this P3 is so good that even meaningless is easy.
If you stick to PP in a few months you will be throwing dirty water at me, and both will laugh, believe me here you will get good at planning, keep asking here.
Best Regards,
Rafael
thank you for answer but during updating what i do
you want scurve without resource or cost?
if you are in a hurry atleast add one resource for all activities and make BQ EQ OD