Thanks Guys,
I have sorted it out
The working times were 8 till 5 but the calender was 7 till 5
The extra hour was pushing the tasks over to the next day
Thanks david & nicolas
Hi Andrew
Check that
1) duration of day
in Tools Options Calendar
is compatible with
2) dayly working time
in Tools Modify working time.
If you tell MSP
that
1) your "day" is 10 hours long
but
2) you allow only 8-12am and 2-6pm you will need
finish the next day.
hth
Trying to "fill down"to make my start times all 7 am but wont let me make the changes.
aaaahhhrrrr
Great idea
I have found the problem in the start times are all over the place, but my calender starts at 7 and finishes at 5 every day
The same calender is assigned to all tasks.
Ill keep digging
could be down to the time also, when does the working day start, etc.
expand the start and finish columns so that you see the start date and time and the finish date and time (you might need to format how the date is viewed).
D.
Working days are set to 8hr days
I figure it has something to do with the calender day anfd hrs but cant put me finger on it!
how long are your days?
silly question, but if youre calendar is 24 hours and you start something at 8am on the 12th, the finish will be 7.59am on the 13th. If your calendar is working hours/days, your duration should (theoretically) be 8 hours, so, start and finish on same date, duration = 1 day.
try putting your duration down as 8 hours.
D.