If you are not aware from the detailed calculation steps of P3. Use the default options of Autocost rules (maybe everything). Autocost rules could change all of the calculations in P3. You can hold your right ear with your left foooot!!! Be aware.
The Primaver F1 help files are so explainatory. Check them. If you have a idea of how you want to track your project and you do not know how to arrange the options. Ask it specifically.
Thanks for the Reply.So you are telling this will be applicable only while updating the program for the actuals against plan.I meant that this is just a customization option to be done as per our wish to update. Am i right.....
basically Auto Cost Rules are to let you customize the way P3 will calculate the actual workload and costs of the resources assigned to your projects activities
you will refer to online hlep (click on the Help button in the dialog box) for complete and comprehensive explanations.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
If you are not aware from the detailed calculation steps of P3. Use the default options of Autocost rules (maybe everything). Autocost rules could change all of the calculations in P3. You can hold your right ear with your left foooot!!! Be aware.
The Primaver F1 help files are so explainatory. Check them. If you have a idea of how you want to track your project and you do not know how to arrange the options. Ask it specifically.
Please do not take this post rude.
Regards,
Safak
Shaji el aziz,
most of the options are for updating the project, a few are for scheduling
look at the help scree, it will explain much better than I can
Alexandre
Dear Mr. Alexander
Thanks for the Reply.So you are telling this will be applicable only while updating the program for the actuals against plan.I meant that this is just a customization option to be done as per our wish to update. Am i right.....
Regards,
S.Shaji Mohamed
Mohammed,
basically Auto Cost Rules are to let you customize the way P3 will calculate the actual workload and costs of the resources assigned to your projects activities
you will refer to online hlep (click on the Help button in the dialog box) for complete and comprehensive explanations.
Alexandre
Mr. Mike
Many Thanks for your response. Hope we will get better replies.
Reg..,
S.Shaji Mohamed
Hi Shaji
I have moved this thread to the P3 forum.
You will get a better response from here.
Best regards
Mike Testro