Productivity rates for design activities

R
Rafael Davila 👤 Member for 22 years 3 months

May I suggest the following reference from the Gulf Publishing Company:

Title: Conceptual Cost Estimating Manual

ISBN 10: 0884152677

Author: John S. Page

Pages: 326

Edition: Second Edition

Binding: Paperback

Price: $120.00 Single Price

"This printing gives the construction industry and the management staff of chemical, refinery, and industrial plants the information they need to generate fast, reasonably accurate costs for designing and constructing a specified facility"

You can follow the links:

http://www.amazon.com/Conceptual-Cost-Estimating-Manual-Reprint/dp/0884…

http://www.gulfpub.com/default.asp?page=14&productID=2706&VS=

I give the reference "as is", I am not into Oil and Gas but as a Civil Works Contractor quoted a couple of Civil Works jobs for the Oil & Gas Industry one of which was a Loading Dock/"Berth". My client was awarded the job.

G
Gary Whitehead 👤 Member for 17 years 2 months

Yes, I use the DDR (Design Documents Register) as the basis for the schedule activities (IFC, IFA, etc). It is very sensible to have the schedule mirror the DDR to ensure common reporting.



The problem I am having is more around getting reliable estimates for the productivity rates / durations of the design activities.

A
Anoon Iimos 👤 Member for 19 years 8 months

Gary,



It seems that "design activities" are very difficult to plan.



I may suggest to make it simple, like steps or "Document Register"; or "Drawing(s) Register"



suggestions from anyone?


Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts