Please find below the sequence or erection of a Lift for since no one answered this question yet:



1. Site Survey of Lift Shaft

2. Installation of Rails

3. Installation of Door Frames

4. Installation of Outside Doors, Indicators and push buttons

5. Assembly of Cabin

6. Installation of Motor

7. Main Cable Installation, Connection to BMS if applicable.

8. Testing

9. Complete Installation of Interior Finishes

10. Balancing and Commissioning



These are the basic steps, other requirements will apply per specifications.