P3e version 5- Baseline problems

N
Norul Faezah Nohi 👤 Member for 17 years 11 months

Dieter Wambach,



Thanks for the reply :). I will try to propose this to my company to use P6 if possible. At the moment , I always encountered this baseline problems/inconsistencies everytime!



**Norul**

D
Dieter Wambach 👤 Member for 19 years 5 months

Prem

This item is solved in P6, so you can copy BLs together with the project. During the call for copy there is a screen where you can select those BL to copy and those for not.

Dieter

P
prem kumar, 👤 Member for 21 years 3 months

but why exporting baseline is not copied along with the project even in P6

D
Dieter Wambach 👤 Member for 19 years 5 months

Norul

This is solved in P6. In P5, baselines were not copied together with a project.

You have to ways: Upgrade to P6 or unlink ("Restore") the BL --> Copy project + BL --> create BL again out of this BL-project.

Regards

Dieter

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts