Dieter Wambach,
Thanks for the reply :). I will try to propose this to my company to use P6 if possible. At the moment , I always encountered this baseline problems/inconsistencies everytime!
**Norul**
Prem
This item is solved in P6, so you can copy BLs together with the project. During the call for copy there is a screen where you can select those BL to copy and those for not.
Dieter
but why exporting baseline is not copied along with the project even in P6
Norul
This is solved in P6. In P5, baselines were not copied together with a project.
You have to ways: Upgrade to P6 or unlink ("Restore") the BL --> Copy project + BL --> create BL again out of this BL-project.
Regards