1.) You can convert your p3. file to PDF file using cute.pdf and attached it to your email.
2.) You can export the data to an excel or database file and attached it to your email
3.) You can send it directly by clicking "file" and then click "send to" this will create an email with the P3 file with an extension PRX and this can be extracted by the receipient but He or She must have a P3 software for him to open the file.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Hi
Have look into the Reference Manual Pages 396 and following.
No need, that the recipient has P3, just PRMMAIL.EXE has to be installed - no licence required as far as I know.
Maybe your admin has to modify the P3.ini.
MAPI.DLL must be installed, i.e. your mail system must be prepared for MAPI - ask your IT.
The updated file can be received by File --> Receive Mail.
Regards
Dieter
You can do it in many ways:
1.) You can convert your p3. file to PDF file using cute.pdf and attached it to your email.
2.) You can export the data to an excel or database file and attached it to your email
3.) You can send it directly by clicking "file" and then click "send to" this will create an email with the P3 file with an extension PRX and this can be extracted by the receipient but He or She must have a P3 software for him to open the file.
Cheers,
Daniel
hi
ask ur IT deptt to fix this for you, it can be used.
cheers
mangesh