Thanks for your feedback but I have also suffered from the trojan on your site, I would suggest that you need to clean it up before many more people try to use it as it will fail if people get a virus, because they just wont go back.
It seems that, everytime somebody asks a query, u explain it in KPMS forum and then divert the route.
I know that u r one of the global moderator of the above site, but Dont take it in a rude way, but the fact is, the site is really very very slow and whenever i open it, antivirus software bangs on showing VIRUS FOUND in temperory internet files folder
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Dieter,
It was the project level setting on the calc tab for the recalculation of actuals based on duration % complete.
Struth! there are so many different things to set and many rabbit holes to run down with this thing.
Thanks
for your fast and helpful feedback.
Via La Planning Planet
Dieter,
Thanks mate, Ill give that a crack.
Khuong,
Thanks for your feedback but I have also suffered from the trojan on your site, I would suggest that you need to clean it up before many more people try to use it as it will fail if people get a virus, because they just wont go back.
Andy
No personal opinions though,
Thats a great initiative, but try to solve the problem as early as possible, as more and more people will start looking into ur forum now.
ALL THE BEST!!!
Cheers,
Raviraj
Hi Raviraj
Im really sorry for the inconvenient we caused.
In fact we wanna build a strong community in VN where project management is still a new aspect.
One again, Please accept my apologize for problem you faced.
Thanks
Khuong
Hi Andrew
Auto compute actuals is a nasty parameter. It comes from three sides:
- Resource, so any of the resources assignments will perform as scheduled - you excluded already
- Activities
- Expenses
The reason might be activity or expense.
Regards
Dieter
Hi Khuong,
It seems that, everytime somebody asks a query, u explain it in KPMS forum and then divert the route.
I know that u r one of the global moderator of the above site, but Dont take it in a rude way, but the fact is, the site is really very very slow and whenever i open it, antivirus software bangs on showing VIRUS FOUND in temperory internet files folder
So, requesting you, not to divert ur posts.
Cheers,
Ravi
Hi Adrew
You can find the answer here:
http://kpms.com.vn/forum/index.php?topic=23.0
Thanks
Khuong