EPS Activity code values in P5
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
Patricia,
No impact at all as P3e/P5 assigned max 3 baseline at a time. Actually its four (4) if you include Project Baseline for EV calculation plus Primary, Secondary and Tertiary baseline. It’s just creating another record into PMDB Database same as creating a project.
Regards,
Rodel
Rodel,
I was convinced we were limited to a maximum of 50 baselines for a project. So thanks for this info.
Nevertheless, if we are not limited in Baseline creation, could it have an impact on performance of P5 ; in this case, it would be better having a limit.
Regards.
Patricia
James,
Yes there are limits depends on your setting on Admin Preferences. To set the limit select Admin-> Admin Preferences then select Data Limits tab.
EPS/WBS tree - 1 to 50
OBS tree - 1 to 25
Resources tree - 1 to 25
Role tree – 1 to 25
Cost Account tree – 1 to 25
Activity Code tree – 1 to 25
Resources Code tree – 1 to 25
Project Code tree – 1 to 25
Maximum Activity Code per project – 0 to 500
Maximum Baseline per project - no limit or up to valid integer value
You can also set the ID code length
Regards,
Rodel