Hi, Rodel! Salamat!
I will email you the stuff that was given to me, and I dont know where to start.....
thank you again.
Regards,
Shaunna
Hi Shaunna Inks,
For Piping usually track as follows.
Piping Fabrication
1) Handling
2) Prep/ Fit-up of spools
3) Welding/ Jointing
4) NDT
5) Painting (Optional/ it can be site painting)
6) Delivery on Site
Piping Instalation
1) Handling/ Set-up in place
2) Jointing (Welding, Screwed, Bolt-up)
3) Valves/ In-line items installation
4) NDT
5) Support/ Hanger
6) Painting/ Touch-up paint
7) Insulation (Optional)
8) Hydrotest
9) Punch list
Commissioning also required but it should be separate WBS as it has their on task/ activities.
Regards,
Rodel
Thanks, Anoon, I was just given a list of the piping spools, total and , with engineering dwg fabrication dates, ship dates, recd on site... but i need to look at a construction methodology, any samples?. thanks again!
check your drawings, specifications and methodologies and apply it