For Piping usually track as follows.



Piping Fabrication

1) Handling

2) Prep/ Fit-up of spools

3) Welding/ Jointing

4) NDT

5) Painting (Optional/ it can be site painting)

6) Delivery on Site



Piping Instalation

1) Handling/ Set-up in place

2) Jointing (Welding, Screwed, Bolt-up)

3) Valves/ In-line items installation

4) NDT

5) Support/ Hanger

6) Painting/ Touch-up paint

7) Insulation (Optional)

8) Hydrotest

9) Punch list



Commissioning also required but it should be separate WBS as it has their on task/ activities.



Regards,

Rodel

S
Shaunna Inks 👤 Member for 19 years 2 months

Thanks, Anoon, I was just given a list of the piping spools, total and , with engineering dwg fabrication dates, ship dates, rec’d on site... but i need to look at a construction methodology, any samples?. thanks again!

A
Anoon Iimos 👤 Member for 19 years 8 months

check your drawings, specifications and methodologies and apply it

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts