why so difficult... in prod rate there is slow, average and fast. U can categories manpower base on trends of each country.
Base on my experience, before we do each project, feasibility study report should be done...that the way we come out the prod rate norm. What i can say here that prod rate is use to get the nearest budget to be applied in costing / scheduling.
Your suggestion is good but this cannot be implemented on this forum as the production rates vary from country to country and it seems difficult to update this variation in rates country wise in this forum on /weekly/monthly/yearly basis.
Moreover one suggestion is that each Company has its own database of production rates and update it on monthly or yearly basis so you may look into it.
Not sure whetehr planning planet know about the problem & in the process of resolving it?
Just a matter of interest since we have members from various country and continent, do any one wish to start a new tread on the subject of the variations in production rates between countries or continent? I am very much a notie to planning and would like to know more.
i had taken a copy of all Production rates from planningplanet. if any1 needs the same, mail me ur emailid. shall mail u the same. till then allow webmasters 2 fix the bug.
Are we the only 4 people who cannot access production rates or does nobody else use them. Ive still had no reply from the PP webmaster so Im not even sure if the rates are avaliable.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Hi there,
Appologies. We thought this issue had been fixed. I will chase the tech team today to see where we are, and why it has not been resolved.
I will report back shortly.
Thanks PP Admin
Hey guys...
me too..
first of all, i thought that my computer problem...
then i fed-up for a while.
Finally i make up my mind to raise question in the forum.Lucky i found this forum...
Yes! I aggree it is very intresting corner to learn.
;-)
Hi,
Thank for the contributions & I believe this is a healthy situation for PP.
Let me start a new tread so as not to contaminate this tread.
See you all there.
Thanks
why so difficult... in prod rate there is slow, average and fast. U can categories manpower base on trends of each country.
Base on my experience, before we do each project, feasibility study report should be done...that the way we come out the prod rate norm. What i can say here that prod rate is use to get the nearest budget to be applied in costing / scheduling.
Richard
Your suggestion is good but this cannot be implemented on this forum as the production rates vary from country to country and it seems difficult to update this variation in rates country wise in this forum on /weekly/monthly/yearly basis.
Moreover one suggestion is that each Company has its own database of production rates and update it on monthly or yearly basis so you may look into it.
Hi Deva,
Thanks for the info.
Not sure whetehr planning planet know about the problem & in the process of resolving it?
Just a matter of interest since we have members from various country and continent, do any one wish to start a new tread on the subject of the variations in production rates between countries or continent? I am very much a notie to planning and would like to know more.
Thanks
Deva,
I would be appreciate if you could send me your prod rate record/file to my email .. [email protected]
Thanks in advance
|R|S|
Dear Stewart,
fwd ur mail id 4 me 2 fwd the production rates.
Dear, Devamalya De
I cant access too, please sent your copy me.
=> [email protected]
many thanks
regards,
PS. I not sure about pm, because Im new user in here.
dear all,
i had taken a copy of all Production rates from planningplanet. if any1 needs the same, mail me ur emailid. shall mail u the same. till then allow webmasters 2 fix the bug.
i have the same problem too. i get the following error message.
Microsoft OLE DB Provider for ODBC Drivers error 80040e31
[MySQL][ODBC 3.51 Driver][mysqld-5.0.18-nt]Out of range value adjusted for column CSO at row 1
/output_results.asp, line 177
Has anyone managed to fix this?
hi all,
same case with me, i had tried many times but to no avail, still a failure...
hope somebody will fix the system...it is really an interesting portion of this website...
Are we the only 4 people who cannot access production rates or does nobody else use them. Ive still had no reply from the PP webmaster so Im not even sure if the rates are avaliable.
CAN ANYONE HELP US!!!
Hi
I just join too but cant get production rate too. Can someone advise what I am doing wrong?
Thanks
Im having the same problem. I cant view any of the production rates etc. I have e-mailed PP but have not had a response.
Me either !
How to production rate for each categories ?