Plant Assembly Planner/Scheduler, Project Time & Cost, Inc., ITER International Fusion Reactor Project

START Date

Cost Engineer

Project Time & Cost, Inc., Westminster, Colorado                                               2008-Present

 

Sr. Planning and Reporting Engineer, vascon engineers ltd, c

START Date
END Date

 

EXPERIENCE:

  • Working as Planning Engineer in Sobha Developers LtdMysore, from April-07 to October-09 (2.5 Years).

 

  • Working as  Sr.Planning Engineer  in Consolidated  construction consortium Ltd , Tuticorin from November-09 to February-10         (1.3 Years)

 

Sr. Planning and Reporting Engineer, vascon engineers ltd, c

START Date
END Date

 

EXPERIENCE:

  • Working as Planning Engineer in Sobha Developers LtdMysore, from April-07 to October-09 (2.5 Years).

 

  • Working as  Sr.Planning Engineer  in Consolidated  construction consortium Ltd , Tuticorin from November-09 to February-10         (1.3 Years)

 

Planner and Senior Planner, siemens, Morgan Est, COLAS RAIL, track renewer, Railway Signalling,telecoms,OHLE

O
olu bailey 👤 Member for 14 years 10 months
START Date

i am a planning engineer,i have being working as a planner since 2005, you can check my attached CV for what i have done in past and what my responsibilities are

Maintenance Scheduler, Planning & Project Control Engineer, Exxon Mobil, Transfield Services Australia, 2PTR & 3PTR Regen, Jet Fuel Treater Project

START Date
END Date

Responsible for overall Project & Maintenance Works Planning, Scheduling, Progress Monitoring and Resource Management

Project Planning & Project Control Engineer, EXPONENT ENGINEERS, HOZHU, MASCO, WARID TELECOM, Building, Oil Terminal, Sewage, Telecom, Water and Waste Water

START Date

Planning Engineer,

Major Responsibilites:

  • Preparing planning packages including WBS, all levels plan, prepared Critical path of the project.
  • Preparing master plan, base line plan , recovery plan, crush schedule,  and schedule for tender and insurance
  • Preparing Revnue cash flow , cost distribution and cash flow ‘S’ curve
  • Preparing resource loading, man power histogram and equipment list
  • Performing Earned value management for measuring project performances, cost analysis and future forecasts

Planning Engineer - Senior, AlGihaz Trading and Contracting Company Riyadh Saudi Arabia, Construction & EPC projects

START Date

(10) Years hands on experience in the field of Project Planning, Scheduling, Monitoring and Cost Control.

 

  • Highly qualified and professional team leader for Planning, monitoring and cost control activities.
  • Competitive Expertise in using Primavera P6 & Primavera Contract Manager 12.1.
  • Registered PMI member and always follow Project management institute Practices and procedures.
  • Ability to work under stress a

Assistant Project Manager, Balfour Beatty Rail, Step Free Access, Platform Lengthening

A
Aqeel Mirza 👤 Member for 14 years 11 months
START Date

Managing station/track access arrangements for works on London Underground (LU) property,

Compiling and submitting documentation to LU in regards to proposed works which require authorisation by various LU departments prior to commencement and subsequently tracking the status of these documents in order to plan works accurately,

Assisting the Design Manager in all aspects of design development including meetings with the client and designers, reviewing design documentation revisions in order to assess compliance with client requirements and standards,

Assisting

Oil & Gas Senior Planning Engineers - Primavera, KNM Process System Sdn Bhd, Amine Absober Project, Mexico

START Date
END Date

1.     Prepare detailed programs and sub – schedules (Level 4) for production teams.

2.     Analyzing & calculating the delay duration & percentage that will be impacted the progress of works.

3.     Periodical maintenance and updating of sections External & Internal Baseline Master Programs.

4.     Review and monitor manpower and machinery update for progress of works.