Earned Value Analysis

EPC Lead Planner, James Fisher Nuclear Limited, SGHWR

J
James Buxey 👤 Member for 21 years 9 months
START Date
Experience Hours (Planning & Scheduling)
2050
Experience Hours (Cost Management)
1100
Experience Hours (Forensic Analysis)
200

Lead Planner - James Fisher Nuclear Ltd

  • Took the lead for a number of programmes related to the delivery of a project to deconstruct one of the legacy R&D Reactors for Magnox
  • Developed, with information I collated, a detailed construction programme that included a complicated Mechanical and Electrical installation phase.
  • Rebaselined the contract programme with the civils and M&E installation sequence including the dependencies of the Safety Case Logic required ahead of major construction.
  • Instigated a tracking system for the remaining design deli

Project Planning Engineer (Oil & Gas), Arabi Enertech, Installation of Crude transit Pumps at GCs and Replacement of Separator Control Valve at SEK GCs

J
Joyson John 👤 Member for 12 years 7 months
START Date
END Date
Experience Hours (Planning & Scheduling)
8850
Experience Hours (Cost Management)
8500
Experience Hours (Forensic Analysis)
3450
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Project Planning Engineer, Alghanim International General trading & Contracting Co., Construction of 500 MW OCGT Power Plant

J
Joyson John 👤 Member for 12 years 7 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2400
Experience Hours (Cost Management)
2400
Experience Hours (Forensic Analysis)
800
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Project Planner, AYESA, project Planner at Pacific E&P - oil & gas

L
luis MOya 👤 Member for 11 years
START Date
Experience Hours (Planning & Scheduling)
300
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
100

Duties:

Projects planning

·         Ensure the application of Integrated Planning processes for assigned projectsde los procesos de planificación integrada de proyectos.

·         Support Project Team in the analysis of the scope of work , definition of the Work Breakdown Structure, implementing and optimizing project execution plans

Integrated Planner & Master Schedule, Ansaldo STS, Linea 2 Metro Lima

START Date
Experience Hours (Planning & Scheduling)
14000
Experience Hours (Cost Management)
9500
Experience Hours (Forensic Analysis)
2500

Head of Planning & Cost Control Department

Develop of EPC Master Schedule

Update execution schedule level 3 and 4.

Cost Control (labor and equipment)

Measure Productivity Index (Labor)

Progress Measurement (Engineering, Procurement, Construction and Commissioning)

Curve S Development

Develop Monthly Reports 

Project Manager, SENIOR PLANNER/Scheduler, LTD “Gerc”, Recreation and civil construction

START Date
Experience Hours (Planning & Scheduling)
10150
Experience Hours (Cost Management)
8400
Experience Hours (Forensic Analysis)
7000

·         5 years of work experience using Oracle Primavera Project Management.

·         2 years of work experience as Primavera P6 Planner in international general construction company LTD “Gerc”.

·         1 years of work experience as Project Manager in international general construction company LTD “Gerc”.

Project Controls Consultant, British Aerospace, OEI British Aerospace

S
Simon Lee 👤 Member for 21 years 6 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
650

Develop detailed plans and provide Project Management Support (Including Cost Control) to a team revitalising Engineering Support Organisation’s within Bae.  Plan and provide Project Controls for the Deployment of Project Control software and Processes for the Eurofighter and Hawk Aircraft build teams, based on the Australian Governments Earned Value Management system (EVM). ~£5bn.

Type 45 Planning Manager, BVT Surface Ship Solutions, Type 45

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
500

Line management responsibility for twelve staff, locations splits between Glasgow (two sites) and Bristol

Manage and maintain T45 programme suite of plans, level 0 to level 2 shipbuild, plus cost control account programming

Key MOD point of contact for all planning queries and activities

Facilitate integration of level 3 to level 2 plans

Selecting new planners to business at interview

What-if analysis and risk mitigation options of all plans level 2 and up

Redesign of WBS, PBS, OBS, and RBS to simplify and set as group standard

Planning Engineer, Larsen & Toubro - ECC Division, EPC of Blast Furnace project

START Date
END Date

Worked at M/s L&T-ECC, engaged through M/s SME for EPC of Blast Furnace project, an expansion project in consortium with M/s Paul Wurth Italia and M/s TATA STEEL Ltd.

Key Responsibilities:

®  Preparation of project schedule in MS Project, Primavera & MS Excel.

®  Interfacing with project staff regarding baseline changes, variance analysis and implementation of corrective action.

®  Preparing weekly and monthly review meeting presentation to report site progress, milestones & strategy to clients.

 

Senior Engineer-Project controls, Larsen & Toubro Ltd., Jack up rig,Pipeline,Wellhead Platforms

START Date
END Date

 Ø  Preparation of Planning & reporting basis.

Ø  Preparation & review of Integrated Detail Schedule and individual Functional schedules (in Primavera).

Ø  Carrying out Integration of Engineering Procurement & Construction schedule considering the various constraints & client requirements(in Primavera).

Ø  Preparation of Progress monitoring & control system.