%100- Project Planning; Progress Reporting; Checkpoint Reporting; Resource Allocation; Change Management; Budget Control

Business Development Manager / Project Controls Manager, gcts, construction of buildings

START Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
39500
Experience Hours (Forensic Analysis)
35300

•     Mainly involved in planning end to end projects. Setting Master Baseline programs, submitting planning packages, and EOT Extension of Time Claims.

•     Attending Client and Consultant meetings to review on progress and smooth execution of the project. Internal meetings to analyze the procurement status.

Planning Coordinator , FOSTER WHEELER ENERGY LIMITED, PETRONAS Second Refinery ( PSR- 2 Revamp) Sg. Udang Melaka Malaysia

START Date
END Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
40000

Employer           : FOSTER WHEELER ENERGY LIMITED

Position             : Planning Coordinator

Project Title       : PETRONAS Second Refinery ( PSR- 2 Revamp)

Based                : Sg. Udang Melaka Malaysia

Project Valued   : USD 1.1 Billion

Project Phase Worked: Execute and Operate

Planning Coordinator , FOSTER WHEELER ENERGY LIMITED, PETRONAS Second Refinery ( PSR- 2 Revamp) Sg. Udang Melaka Malaysia

START Date
END Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
40000

Employer           : FOSTER WHEELER ENERGY LIMITED

Position             : Planning Coordinator

Project Title       : PETRONAS Second Refinery ( PSR- 2 Revamp)

Based                : Sg. Udang Melaka Malaysia

Project Valued   : USD 1.1 Billion

Project Phase Worked: Execute and Operate

Planning Coordinator , FOSTER WHEELER ENERGY LIMITED, PETRONAS Second Refinery ( PSR- 2 Revamp) Sg. Udang Melaka Malaysia

START Date
END Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
40000

Employer           : FOSTER WHEELER ENERGY LIMITED

Position             : Planning Coordinator

Project Title       : PETRONAS Second Refinery ( PSR- 2 Revamp)

Based                : Sg. Udang Melaka Malaysia

Project Valued   : USD 1.1 Billion

Project Phase Worked: Execute and Operate

3 years as a Project Engineer, Al-Mohanna Trading & Contracting Co., Road Improvement Works In Rayyan Area Phase-04

START Date
END Date
Experience Hours (Planning & Scheduling)
0

·         Visited project sites during construction to monitor progress and consult with contractors and on-site               engineers.

·         Supervised other engineers and technicians.

·         Coordinated with drafts-persons and technicians to transform designs to working drawings.

Junior Project Planner, Civil & Power (CPGP), Madupi Power Station Unit6

START Date
END Date
Experience Hours (Planning & Scheduling)
1800
Experience Hours (Cost Management)
1050
Experience Hours (Forensic Analysis)
400

REPORTING:  ◘ Performance management on teams, middle management for exco review   ◘ Compiling tracking sheets to track progress through weighting system   ◘ Progress reporting  ◘ Daily performance and progress analysis through review of daily diaries GENERAL:  ◘ Compiling histograms on manpower allocations   ◘ Assisting senior planner on structuring of documentation work flow

Assistant Project Engineer, Cekap Technical Services Sdn Bhd, 1. Detail Study of FMECA for PM323 & PM 329 for SKE 2. Provision of Bathymetric Survey for Dredge Navigation Channel

A
Arif Sazali 👤 Member for 9 years 8 months
START Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
50

My roles & responsibilities involve planning, and monitoring on project execution, resource, and contract management as per following:

• Strategic planning which includes setting up project goals, identifying project
deliverables, setting up project milestones and develop projects tasks.
• Resource planning that includes establishes responsibility matrix and man-hour loading
for labor resource and strategize requirement and requisition plan for non-labor
resource.
• Establish and execute procedures and guideline for contractual management throughout the
whole projects.

PROJECT ENGINEER, Cekap Technical Services Sdn Bhd, 1. PMC for Zuhal East Development Project 2. PMC for Development of Layang Wellhead Platform

A
Arif Sazali 👤 Member for 9 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
50

Area of Experience: Contract Management For some project, I am responsible for the contractual management and administration of the project which includes the following: • Establish standard procedures and guideline that conform to the project terms and conditions. • Execute & manage contracts entered into with vendors and contractors to uphold to the project and company’s term and conditions. • Provide administrative support to the project team and support team which includes project meetings and travel arrangement, general procurement activities.

PROJECT ENGINEER, Cekap Technical Services Sdn Bhd, 1. Detail Study of Failure Mode, Effect and Crtiticality Analysis for PM323 and PM 329 for SapuraKencana 2. Provision of Bathymetric Survey for Dredge Navigation Channel and Basin

A
Arif Sazali 👤 Member for 9 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
50

 CEKAP TECHNICAL SERVICES SDN BHD (August 2012 – Ongoing) Position: Project Engineer My roles & responsibilities involve planning, and monitoring on project execution, resource, and contract management as per following: · Strategic planning which includes setting up project goals, identifying project deliverables, setting up project milestones and develop projects tasks.

Planning Engineer, Wade Adams Contracting LLC or HILALCO, KPIZ – Khalifa Port & Industrial Zone ( Package 1001-290)

START Date
END Date

Key Deliverables:

ð  Worked as Planning Engineer with Primavera 6 version 7 as Planning Tool.

ð  Monitoring was 3 dimensional - Duration is the base, where progress or execution with BOQ quantities & Earned value are monitored periodically.

ð  Monitoring Design, Procurement, Construction Progress & Resources in coordination with Design Consultant / Site Supervision / Management.