Maintenance Engineer, AGORTECH Pvt. Ltd, Construction

START Date
END Date

Responsible for INSTALLING and MAINTENANCE of the Compressors & Pumps

Provide Preventive Maintenance & Scheduling for preventive and Breakdown Maintenance

Centrifugal Pumps Replacement of mechanical seals, rotor, wearing rings, bearings, shaft alignments and complete overhaul

Reciprocating Pumps Replacement of plungers, plunger packing, valves, inspection and maintenance of crank case and cross head

China Petoleum Engineering & Construction Crop Senior Planner

Project:-          WHITE OIL PIPE LINE PROJECT, PAKISTAN. (WOPP 789 Km)

Client:-          PAK ARAB PIPELINE COMPANY. (PAPCO)

AS Sr. PLANNING ENGINEER

Major Responsibilities

I.     Developing of master schedule (Level II) for EPCC (Engineering, Procurement, Construction and Commissioning).

II.     Developing of WBS (work break down structure) for preparation of detail level III and level IV Schedule.

III.     Developing of detail Level IV schedule.

SNAMPROGETTI – Milano Planner

Project:-          BHIT GAS FIELD DEVELOPMENT PROJECT, PAKISTAN.

Client:-          LASMO OIL PAKISTAN LTD.

AS Sr. PROJECT CONTROL ENGINEER

Major Responsibilities               

I.     Preparation of Level II construction schedule at Primavera Project Planner.

II.     Verification & Analysis of Contractor Level III & IV construction schedule.

III.     Monthly feasibility preparation on the basis of work frontage, availability of equipment and material.

IV.     Progress Monitoring & Report Generation for Client and Head Office.

Descon Engineering Limited Pakistan Planner

Project:-          PARCO MID COUNTRY REFINERY MAINTENANCE PROJECT.

Client:-          PAK ARAB REFINERY COMPANY

AS MAINTENANCE PLANNER / SCHEDULER

Major Responsibilities     

I.     Lubrication schedule for the Pumps, Compressors, Turbine, Blower & Fans at Primavera

II.     Planning / Scheduling of Preventive Maintenance for rotary equipment at Primavera

III.     Resource / Manpower allocation for the break down job.

IV.     Preparation of Parts / Lube requirement for the whole year.

Marubeni Corporation Mechanical Engineer

Project:-          MID COUNTRY REFINERY PROJECT (MCRP)

Client:-          PAK-ARAB REFINERY COMPANY

AS PIPING SUPERVISOR (TESTING CO-ORDINATOR)

Major Responisibilities

I.     Fabrication & Erection of Process & Utility Piping.

II.     Preparation and approval of test packs. (1127 Nos).

III.     Preparation of schedule for testing.

IV.     Conduct the hydro / pneumatic tests, flushing & air blowing.

V.     Supervision of Punch killing work.

Habib Rafiq (Pvt) Ltd. Senior Planner

Project:-          SABA POWER PLANT, FAROUQABAD, SHEIKHPURA.

          COMMON EFFLUENT PRE TREATMENT PLANT, KASUR.

Client:-          COASTAL POWER LTD.

          KASUR TANNERIES WASTE MANAGEMENT ASSOCIATION.

AS PLANNING ENGINEER

Major Responsibilities

I.     Planning & Scheduling of Cooling Tower, Turbine Generator & accessories, BOP. Equipments & related piping and pipe supports.

II.     Prepare Monitoring & Billing System (Both for sub-contractor & client).

III.     Progress Monitoring & Report Generation for Client and Head Office.

SEFEC ENGINEERING (PVT.) LTD Planning Manager

Project:-          SABA POWER PLANT, FAROUQABAD, SHEIKHPURA.

Client:-          COASTAL POWER LTD.

AS ASSISTANT MANAGER (PLANNING)

Major Responsibilities     

I.     Planning & Scheduling of Steel Structure Erection & Field erected Tanks.

II.     Prepare Monitoring & Billing System (Both for sub-contractor & client).

III.     Progress Monitoring & Report Generation for Client and Head Office.

IV.     Forecast For the Next Month & Quarter.

V.     Invoicing of Normal Works on quantities basis.

VI.     Claims & Extra Work Billing.