Whessoe Asia Pacific Project Manager
Project Manager (site based) - Kalayaan Hydro Project
PH
Project Manager (site based) - Kalayaan Hydro Project
Name of former employers in the Philippine construction industry:
NICORP MANAGEMENT & DEVELOPMENT CORP. (Project Engineer / Inspector – 1996)
KONSTRUCT MASTERS, INC. (Project Engineer – 1995)
SH VARGAS CONSTRUCTION (Project Engineer / Cost Estimator – 1994)
GOTESCO PROPERTIES, INC. (Project Engineer / Inspector – 1993)
DATEM, INC. (Project Engineer – 1991-93)
Position : PROJECT ENGINEER
(ENTREPRENEURIAL BUSINESS)
Nature of Business:
My established 1925Beta Builders have ventured in contracting several small scale projects that involves engineering, procurement and construction with its associated management and planning tasks. Several project feasibility studies that involve structural design works have also been undertaken.
In my short period of stay with Halelani due to aborted overseas work offer, I was able to accomplished two retaining wall projects in a highland subdivision to reclaim residential usability of land and three fit-out projects. The most challenging of the retaining wall projects is that of the 10m in height and 150m in length which was constructed using geotextile materials in four months period in a very rugged terrain along a creek.
Position : STRUCTURAL DESIGN ENGINEER
1. Structural design and analysis using STAAD program and manual calculation.
2. Plumbing and sewerage system design for the structure being structurally designed.
3. Assist in Autocadd drafting of the designed structure.
4. Submit completed design to the structural designer based in Saudi Arabia via Email.
Current Role
Current Role
• Prepared the over all construction schedule and see the required manpower, equipment, materials and supplies are anticipated and provide such that the approved construction schedule is maintained.
• Coordinated all field activities with the various sub-contractors engineers, foreman and assign the day-to-day task and assured that the final construction meets the overall schedule, layout, and installation requirement of the contract.
• Responsible for the supervision of the banks construction project to ensure that the design and specification are complied with the acceptable methods of construction.
• Responsible for the coordination of activities of the bank to ensure the efficient execution of construction activities.
• Responsible for the preparation of percentage accomplishments, completion of the contractor for payment purposes.
• Responsible for obtaining any required permits for the progression of work.