In my short period of stay with Halelani due to aborted overseas work offer, I was able to accomplished two retaining wall projects in a highland subdivision to reclaim residential usability of land and three fit-out projects. The most challenging of the retaining wall projects is that of the 10m in height and 150m in length which was constructed using geotextile materials in four months period in a very rugged terrain along a creek. Simultaneously, the fit-out projects were executed with the most challenging one of accomplishing the 500sq.m offices in the 44th floor of PBCom Tower in one month period. All of which was successfully done utilizing the project and contract management norms with the planning/scheduling software MS Project. Assistance to the general manager in material procurement and bid preparations was as well carried out.