Malaysia (AS.MY)
SunFah Yip
30 years in oil & gas industry, 24 years of which are project and construction related. Experiences include planning & project controls, from engineering stage till offshore installation & commissioning.
Familiar with scheduling software such as MS Project and Primavera P3 to produce duartion and resource based tracking, CPM schedules, network diagram and create progress s-curves, etc.
Proficient in using MS Office application such as Words, Excel, PowerPoint etc.
Project Planner, Mentega Resources Sdn. Bhd., Legoland Theme Park Malaysia
- Planning & scheduling work activities and resources for all projects.
- Prepare extension of time.
- Prepare Mitigation Plan when the project is delay.
- Prepare, update and adjust work schedule to cater the differences in original plan versus actual work progress.
- Prepare Weekly & Monthly Progress Report.
Project Planner, Iskandar Waterfront Sdn. Bhd., Johor Bahru Coastal Highway
- Planning & scheduling work activities and resources for all projects.
- Prepare, update and adjust work schedule to cater the differences in original plan versus actual work progress.
- Prepare Weekly & Monthly Progress Report.
- Monitor actual daily production rates of sub-contractor works and forecast the possibility of works to be completed on time.
Estimator, Technip, Kuantan and Segamat Compressor Station Expansion Project (Malaysia), Everest Project - Map Ta Phut (Thailand), Sisi Nubi Field Development Project – Phase 1 (Indonesia), Reformers and Aromatics Complex II Project - Map Ta Phut (Thaila
Prepared the bid cost estimate by means of computing the cost of mechanical equipment (pressure vessel, tank, column, heat exchanger, air cooled heat exchanger, compressor, and pump); calculating cost of bulk items; estimating the engineering, construction, and overhead cost; and summarizing all costs in Executive Price Sheet
Contract Trainer/Consultant/Implementation/SME, CoreVentus Seminars, Project Controls and Construction Management Training
Provided training in Construction Infrastructure Management to a group of Malaysian Owners, Contractors, and Construction Managers. Taught construction management from a project controls perspective, showing how to create a planning and scheduling culture within the company and to manage all projects from the schedule.
Rizal Mohamed
1. Responsible for works program, planning, and reporting using PRIMAVERA ,Microsoft Project & Excel software.
2. Establish detailed programs and sub – schedules at site level.
3. Periodical maintenance and updating of sections External & Internal Baseline Master Programs.
4. Review and monitor manpower and machinery update for progress of works.
Oil & Gas Senior Planning Engineers - Primavera, KNM Process System Sdn Bhd, Amine Absober Project, Mexico
1. Prepare detailed programs and sub – schedules (Level 4) for production teams.
2. Analyzing & calculating the delay duration & percentage that will be impacted the progress of works.
3. Periodical maintenance and updating of sections External & Internal Baseline Master Programs.
4. Review and monitor manpower and machinery update for progress of works.
Planning Engineer - Senior, Malaysia Marine Heavy Engineering (MMHE) , OIL&GAS Platforms Project
Preparing project schedule primavera P3, updating progress report, make strategic plan or recovery plan,
prakash subramaniam
Prakash Subramaniam
Contact Details
Address : PT297-A,Kampung Baru Sungai Nipah,, Port Dickson,Negeri Sembilan,
&n